LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  1       AUDITOR GENERAL - OFFICE OF THE                           

                                                                                                                                   Filed:       5/21/2009

  To properly complete the financial audit of the Illinois Student Assistance Commission the

  engagement needs to begin as soon as possible. The Office of the Auditor General issued a request for

  proposals in an attempt to procure these services through a competitive selection process.  However, no

  proposals were submitted in response to our request for proposal solicitation process.  This firm has

  experience with the Office's audit program.  A fair and reasonable price was negotiated with the vendor

  which has sufficient staff and expertise to perform this engagement and begin work within the necessary

  timeframe to avoid serious disruption in State services.

   Signed By: Bruce Bullard, Director

      Vendor:  McGladrey & Pullen LLP                                                       Notary Date:           5/21/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $294,100.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  2       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       4/21/2009

  This emergency contract is for management consulting services to allow the Illinois Office of Internal

  Audit to properly perform a statewide risk assessment of the impact of the American Recovery and

  Reinvestment Act of 2009 (ARRA) on IOIA's agencies' federal programs, processes, controls and

  information system reporting capabilities.

   Signed By: Shirley Webb, Contract Compliance Manager

      Vendor:  Crowe Horwath LLP                                                              Notary Date:           4/20/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $500,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 1 of  20


 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  3       CHILDREN AND FAMILY SERVICES, DEPARTMENT OF    

                                                                                                                                   Filed:       6/11/2009

  DCFS requested the new contract based on the immediate need to continue Chrysalis' services in the

  process of maintaining and transferring a centralized database to assist the Agency Performance Team's

  protocol collection work from vendor to be hosted by DCFS and also provide transition services to new

   vendor (if necessary) from FY 09 competitive bid process.

   Signed By: Sharon Clanton, State Purchasing Officer

      Vendor:  Chrysalis Consulting Company                                                 Notary Date:             6/1/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $422,964.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  4       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:         5/1/2009

  This emergency is to purchase fertilizer in time for planting season for Union County Refuge.

   Signed By: Ellen King-Pietrzak, Chief Fiscal Officer

      Vendor:  Southern FS Inc.                                                                     Notary Date:           4/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $42,367.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  5       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:         5/1/2009

  This emergency is to purchase fertilizer in time for planting season for Horseshoe Lake Refuge.

   Signed By: Ellen King-Pietrzak, Chief Fiscal Officer

      Vendor:  Southern FS Inc.                                                                     Notary Date:           4/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $18,830.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 2 of  20


 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  6       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:         4/7/2009

  A repair on the fluid cooler for the west wing of the lodge at Starved Rock State Park is required.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Chapman's Mechanical Systems                                              Notary Date:             4/7/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $47,750.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  7       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:         6/4/2009

  On 9-16-08 record flood waters on the Illinois River engulfed the Waste Water Treatment Facility at

  Starved Rock State Park.  As a result several motors, fans, blowers and controls that operate the Waste

  Water Treatment Plant were severely damaged.  During this time frame the Starved Rock Campground

  and Starved Rock Lodge were in full operation and at near maximum capacity which places a

  substantial demand on the WWTP.  As waters receded and staff were able to access the plant it was

  determined that immediate action was required to keep the plant operating in order to prevent a public

  health and/or EPA violation from raw sewage seeping into the open areas of Starved Rock State Park. 

  The other alternative was to close all of Starved Rock State Park including the Lodge and Campground

  which could have resulted in a loss of revenue up to $40,000 and associated negative public relations.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Revere Electric Supply Company                                             Notary Date:             6/3/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $52,896.99                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

 

 

7/15/2009                                                            rptQuarterlyW                                                         Page 3 of  20


 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  8       NATURAL RESOURCES, DEPARTMENT OF                         

                                                                                                                                   Filed:       6/23/2009

  This emergency project will reclaim an abandoned mine shaft in a park in Toluca in Marshall County. 

  Procuring the work will eliminate a recently failed and extremely hazardous mine shaft at a site

  frequented by children.  Work will include excavating the shaft and properly backfilling it with

  aggregate materials, capping it with soil and establishing vegetation.

   Signed By: Norm Dixon, SPO

      Vendor:  Hughie Leake                                                                         Notary Date:           6/16/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $91,013.20                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  9       CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       4/20/2009

  This machine is required to image all incoming and outgoing mail at Hill Correctional Center.  It is

  also used to detect weapons hid in prison contraband.  This machine is vital to the inspection of legal

  mail incoming and outgoing as it cannot be opened by staff.  The absence of this machine creates danger

   to the facility workers, the residents and the general public at large.

   Signed By: Wayne Robke, Acting Bus. Admin.

      Vendor:  Rapiscan Systems                                                                   Notary Date:           4/20/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $28,735.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

 

 

7/15/2009                                                            rptQuarterlyW                                                         Page 4 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  10     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       4/29/2009

  Contract is not in place.  Industries is working to complete this contract request.  Industries needs

  160,000 lbs. to complete the existing orders for the fiscal year of 09 for the DOC.

   Signed By: Donna Lindenmulder, Senior Public Ser. Admin.

      Vendor:  Midwest Quality Foods                                                           Notary Date:           4/22/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $236,480.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  11     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       4/29/2009

  Water control replacement with water softener upgrade and fire pump replacement.

   Signed By: Michael Rothwell, Warden

      Vendor:  Unknown                                                                               Notary Date:           4/10/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $350,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 5 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  12     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       5/22/2009

  The boilers in the following buildings have become defective and are non-operational and need to be

  replaced prior to the start of the next heating season.  Housing Unit C-2, estimated $35,000 has a crack

  in the cast iron water jacket.  This unit houses 32 offenders.  Second, housing unit C-14, estimated

  $50,000, repair parts are no longer available and boiler needs replacing.  This unit houses 100 offenders.

    Third, Industry Building, estimated $100,000, the State Fire Marshal will not issue a certificate to

  operate the boiler.  This unit has some 200 workers in the building daily.  Finally the

  Administration Building, estimated $75,000, has at least three leaks in the boilers cast iron sections

  and needs to be replaced before the next heating season.  This building houses the Wardens, Business

  and Records Offices, Mailroom, Personnel, Investigations and the B of I.

   Signed By: Carolyn Trancoso, Warden

      Vendor:  Unknown                                                                               Notary Date:           4/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $260,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  13     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:         6/2/2009

  Emergency purchase due to the condition of the windows in Building #19 all 3 floors.  Third floor

  wings Housing Units 1,2,3,&4; windows do not close properly and poses a safety issue with inmates

  able to acquire glass to make weapons or be hit by falling glass.

   Signed By: Yolande Johnson, Warden

      Vendor:  Unknown                                                                               Notary Date:         10/21/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $500,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 6 of  20


 

 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  14     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/30/2009

  The request for this emergency purchase is because a portion of the existing firm alarm system has

  failed.  The audible horns and visual strobe lights for the fire system have failed on all four doors.  The

  Health Care Unit houses a chronically infirm and non-ambulatory population.  The failure of the fire

  alarm has placed this population at risk.  The existing fire alarm system is obsolete and much of the

  system will have to be replaced to make the system operational.

   Signed By: Nedra Chandler, Warden

      Vendor:  Honeywell & Building Control                                                 Notary Date:           5/19/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00             $560,000.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  15     EMPLOYMENT SECURITY, DEPARTMENT OF                    

                                                                                                                                   Filed:       4/14/2009

  The Department of Employment Security requires immediate assistance in establishing and staffing a

  center for the processing of Extended Benefit (EB) unemployment benefit claims.  During periods of

  abnormally high unemployment, additional weeks of EB are payable to claimants who have exhausted

  their total amount of regular unemployment benefits.

   Signed By: Barry Isaacson, State Purchasing Officer

      Vendor:  Afni, Inc.                                                                               Notary Date:           4/10/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,000,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 7 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  16     EMPLOYMENT SECURITY, DEPARTMENT OF                    

                                                                                                                                   Filed:       6/12/2009

  The Department is allowing a protest submitted by Peak Business Equipment to the Department's sole

  source award to Bowe Bell & Howell for maintenance on the Department's BB&H mailing equipment.

   It appears that more than one vendor is able to provide maintenance services for the equipment.  Under

  Procurement Rule Section 1.2030(b)(3), IDES plans to extend its contract with Bowe Bell & Howell,

  which expires on June 30, 2009 for the period of time (three months) needed to complete a competitive

  vendor selection process.  Allowing this contract to terminate may put the Department's ability to mail

  critical documents at risk and would, therefore, not be advantageous to the State.

   Signed By: Barry Isaacson, State Purchasing Officer

      Vendor:  Bowe Bell & Howell                                                              Notary Date:           6/10/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $30,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  17     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:       5/21/2009

  H1N1 Flu Pandemic

   Signed By: Alan Biggerstaff, Deputy Director

      Vendor:  RCOHE Diagnostics Corp.                                                     Notary Date:           5/18/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $40,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 8 of  20

 

 


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  18     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       4/27/2009

  The Department is scheduled to receive funding as part of the American Recovery and Reinvestment Act

   (ARRA) of 2009, which we will award to subrecipients throughout the state to perform specified

  construction projects.  The ARRA requires that states properly coordinate and conduct oversight of all

  federal spending under the ARRA to prevent waste, fraud and abuse.

   Signed By: Ann Schneider, Director

      Vendor:  Crowe Horwath LLP                                                              Notary Date:           4/17/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $250,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  19     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       4/27/2009

  The Department is scheduled to receive funding as part of the American Recovery and Reinvestment Act

   (ARRA) of 2009, which we will award to subrecipients throughout the state to perform specified

  construction projects.  The ARRA requires that states properly coordinate and conduct oversight of all

  federal spending under the ARRA to prevent waste, fraud and abuse.

   Signed By: Ann Schneider, Director

      Vendor:  RSM McGladrey Inc.                                                             Notary Date:           4/17/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $250,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                         Page 9 of  20

 

 


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  20     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       5/21/2009

  A severe wind storm passed through the district on May 8, 2009 and causing severe damage in the area.

    It will require extensive debris clean up operations.  This equipment will be used to clean up trees,

  and other debris currently scattered throughout the area on State of IL roadways and right of way.

   Signed By: Mary Lamie, Regional Engineer

      Vendor:  Burris Equipment                                                                    Notary Date:           5/13/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $33,720.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  21     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       5/21/2009

  A severe wind storm passed through the district on May 8, 2009 and causing severe damage in the area.

    It will require extensive debris clean up operations.  This equipment will be used to clean up trees,

  and other debris currently scattered throughout the area on State of IL roadways and right of way.

   Signed By: Mary Lamie, Regional Engineer

      Vendor:  Bobcat of St. Louis                                                                 Notary Date:           5/13/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $17,820.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 10 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  22     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       5/28/2009

  A severe wind storm passed through the district on May 8, 2009 and causing severe damage in the area.

    It will require extensive debris clean up operations.  This equipment will be used to clean up trees,

  and other debris currently scattered throughout the area on State of IL roadways and right of way.

   Signed By: Mary Lamie, Regional Engineer

      Vendor:  Bobcat of St. Louis                                                                 Notary Date:           5/15/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $12,320.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  23     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:         6/4/2009

  While investigating issues at Eastbound I-90 near Cicero Avenue, our consultant and cleaning

  contractor observed and televised a collapsed 12-inch drainage pipe that has developed into a void under

   the eastbound left travel lane and adjacent shoulder.  The pipe was part of an abandoned and capped

  storm sewer that collapsed and has undermined the pavement.  Failure to fill this void and seal this

  section of pavement from continued storm drainage could result in shoulder and pavement damage,

  failure or collapse.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Uretek USA Inc.                                                                    Notary Date:           3/23/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $200,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 11 of  20

 

 


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  24     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:         5/5/2009

  The existing steam boiler which feeds the kitchen, dishwasher machine and the steam tables is not fully

   functional.  The dietary services section provides three meals per day, seven days per week to the 340-

  bed skilled care nursing facility.

   Signed By: Deborah Miller, Chief Fiscal Officer

      Vendor:  Unknown                                                                               Notary Date:             5/4/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  25     ILLINOIS WORKERS' COMPENSATION COMMISSION

                                                                                                                                   Filed:       6/26/2009

  Agency is required to report to the Governor and the General Assembly by January 1, 2010, on the

  implementation of the fee schedule and completion of the update of the hospital inpatient coding

  system.  Agency needs immediate services of Vendor to evaluate the fee schedules and assist agency

  with the report.  Emergency services are necessary in order to maintain IWCC medical fee schedule,

  comply with P.A. 94-277 and minimize disruption to State services.

   Signed By: Katherine Devereaux, SPO

      Vendor:  True Course Medical Data                                                      Notary Date:           6/25/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $45,000.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 12 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  26     GOVERNORS STATE UNIVERSITY                                  

                                                                                                                                   Filed:       5/18/2009

  The application for newly available, federal stimulus dollars requires immediate research, planning and

  schematic design of an architectural firm.  Failure to hire a firm immediately would prevent the

  university from submittal for this potential federal award for renovations.  Applications including the

  outcome of this contract requires internal review and federal application in coming weeks.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  LCM Architects                                                                     Notary Date:           5/14/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $65,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  27     GOVERNORS STATE UNIVERSITY                                 

                                                                                                                                   Filed:       6/16/2009

  The application for newly available, federal stimulus dollars requires immediate research, planning and

  schematic design of an architectural firm.  Failure to hire a firm immediately would prevent the

  university from submittal for this potential federal award for renovations.  Applications including the

  outcome of this contract requires internal review and federal application in coming weeks.

   Signed By: Tracy Sullivan, SPO Designee

      Vendor:  LCM Architects                                                                     Notary Date:           6/15/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $88,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 13 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  28     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:         6/8/2009

  The Department of Physics has a grant from the U.S. Department of Education for laboratory

  equipment.  The grant expires June 14, 2009.  The final total balance available under the grant for

  expenditures was not determined until late April, and it took some time to determine how the funds

  would be spent and to obtain pricing for the desired equipment.  Physics desire to purchase an HR-

  800/T3 Dazzler system, a specialized laser-beam shaping system.  This equipment is only available

  from Fastlite, but there was insufficient time to post this item on the procurement bulletin as a sole

  source.  To avoid loss of federal funds and to ensure that the continuing research mission of the

  department is not compromised, it is necessary to make this purchase on an emergency basis.

   Signed By: Eddie Williams, Executive VP

      Vendor:  FASTLITE                                                                            Notary Date:             6/4/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $67,774.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  29     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       4/15/2009

  The SIU School of Medicine SimmonsCooper Cancer Institute (SCCI) is currently under a strict lock-

  down due to original building contractor inadvertently allowing soot from one boiler to infiltrate the

  building.  This occurrence has created a safety hazard to life and property and needs to be addressed

  immediately.  It is necessary for the SIU School of Medicine to contract with United Analytical

  Services, Incorporated, Illinois-based industrial hygienists, to assist in sampling, testing, preparing

  clean-up documents, and performing final testing to ensure the health and well-being of our patients and

  employees and guarantee successful resolution of this industrial hazard prior to impending opening of

   Signed By: Pamela Speer, State Purchasing Officer

      Vendor:  United Analytical Services Inc                                                 Notary Date:             4/9/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $23,095.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 14 of  20

 

 


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  30     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       6/11/2009

  The storm damage from the May 8 disaster has required more tree assessment and removal services than

   the University can handle with internal forces.  The fallen trees are road and walkway hazards for

  pedestrians as well as the neighboring structures.

   Signed By: Kevin Bame, SPO Designee

      Vendor:  The Davey Tree Expert Company                                           Notary Date:             6/3/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $250,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  31     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         4/3/2009

  This emergency repair of a heating system located at the University of Illinois at Chicago Douglas Hall

  Building.  The perimeter piping mains were frozen and experienced multiple ruptures causing

  considerable damage throughout the building.  The services include removal and replacement of

  perimeter piping mains, extensive sheet metal work to expose the induction units, and removal and

  replacement of insulation.  The emergency repair service was required to ensure life safety concerns to

  the occupants in the building and to prevent serious disruption in student services.

   Signed By: Heather Haberaecker, SPO

      Vendor:  KROESCHELL, Inc.                                                              Notary Date:           3/30/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:                       $0.00              $97,636.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 15 of  20


 

 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  32     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       5/14/2009

  Due to the long lead times of the ordering and purchase of the equipment needed for the repair of the

  compressor on Chiller 6, a competitive process would delay this repair further into the cooling season

  and risk the ability to meet the campus cooling needs.

 

  A letter was received dated June 12, 2009 reporting the Actual cost as $166,240.00.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Johnson Controls                                                                    Notary Date:           5/12/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $166,240.00             $166,240.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

 

  33     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       6/24/2009

  This emergency expenditure is for soft drinks for students, faculty, staff and visitors to the University. 

  The State of Illinois issued a Request for Proposals for a Soft Drink Prime Vendor contract for the State

  in FY 07.  The State had requested that the University participate in the Prime Vendor contract once it

  was awarded.  The RFP evaluation took longer than anticipated putting the State behind schedule in

  the final decision to select Pepsi Cola as their Prime Vendor.  Since the University was ending a Prime

  Vendor relationship with Coca Cola, they still had the delivery personnel and equipment available to

  meet our immediate needs.  Coca Cola Enterprises, Inc. was willing to enter into a short term contract

  through June 30, 2010, while we complete our RFP process and award.

   Signed By: Michael Devocelle, SPO Designee

      Vendor:  Coca Cola Enterprises Inc.                                                      Notary Date:           6/19/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $1,500,000.00                      $0.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 16 of  20


 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  34     CORRECTIONS, CORRECTIONAL CENTER - DWIGHT       

                                                                                                                                   Filed:       9/18/2006

  A letter was received dated June 9, 2009 reporting the Actual cost of item #13 in our October 13, 2006

  report as $156,448.00.

   Signed By: Mary Sigler, Warden

      Vendor:  Unknown                                                                               Notary Date:             8/9/2006

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $200,000.00             $156,448.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  35     CORRECTIONS, CORRECTIONAL CENTER - PONTIAC      

                                                                                                                                   Filed:      11/28/2007

  A letter was received dated June 9, 2009 reporting the Actual cost of item #4 in our January 15, 2008

  report as $101,294.55.

   Signed By: Eddie Jones, Warden

      Vendor:  Various                                                                                  Notary Date:         11/19/2007

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $65,000.00             $101,294.55                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  36     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       5/12/2008

  A letter was received dated June 9, 2009 reporting the Actual cost of item #22 in our July 15, 2008

  report as $9,347.00.

   Signed By: Jody Hathaway, Warden

      Vendor:  Unknown                                                                               Notary Date:           4/30/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00                $9,347.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 17 of  20

 


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  37     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/18/2008

  A letter was received dated June 9, 2009 reporting the Actual cost of item #20 in our January 15, 2009

  report as $34,875.49.

   Signed By: Sal Raymond, Asst. CEO

      Vendor:  Newly Weds Foods                                                                Notary Date:           12/9/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $39,400.00              $34,875.49                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  38     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/18/2008

  A letter was received dated June 9, 2009 reporting the Actual cost of item #19 in our January 15, 2009

  report as $958,000.

   Signed By: Frank Shaw, Warden

      Vendor:  Unknown                                                                               Notary Date:         11/24/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $75,000.00             $958,000.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  39     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/29/2008

  A letter was received dated June 9, 2009 reporting the Actual cost of item #13 in our October 15, 2008

  report as $95,309.00.

   Signed By: Andy Ott, Warden

      Vendor:  Wissehr Electric                                                                     Notary Date:           8/21/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $74,735.00              $95,309.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 18 of  20


 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  40     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/24/2008

  A letter was received dated June 9, 2009 reporting the Actual cost of item #21 in our January 15, 2009

  report as $121,430.

   Signed By: Greg Schwartz, Acting Warden

      Vendor:  S.I. Piping                                                                              Notary Date:         12/18/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $100,000.00             $121,430.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  41     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:       7/11/2008

  A letter was received dated April 9, 2009 reporting the Actual cost of item #20 in our October 15, 2008

  report as $78,668.50.

   Signed By: Thomas Sestak, SPO

      Vendor:  E.L. Johnson Investigations                                                     Notary Date:             7/9/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $216,000.00              $78,668.50                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  42     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:         1/2/2008

  A letter was received dated April 9, 2009 reporting the Actual cost of item #27 in our April 15, 2008

  report as $113,721.00.

   Signed By: Thomas Meirink, State Purchasing Officer

      Vendor:  Magellan Health Services                                                        Notary Date:         12/28/2007

                                      Estimate                  Actual                                                  FY             QT

     State Cost:           $4,000,000.00             $113,721.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 19 of  20


 

                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                              FILED WITH THE OFFICE OF THE AUDITOR

                                                         April 1, 2009 through June 30, 2009

  43     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/31/2008

  A letter was received dated April 17, 2009 reporting an amended Actual amount for item #59 in our

  October 15, 2008 report as $392,500.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  A D Johnson                                                                          Notary Date:           7/28/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:             $365,400.00             $392,500.00                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  44     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         9/3/2008

  A letter was received dated April 14, 2009 reporting the Actual cost of item #64 in our October 15, 2008

   report as $50,339.02.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Archer Daniels Midland                                                          Notary Date:           8/25/2008

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $51,800.00              $50,339.02                                                  9                4

     Federal Cost                    $0.00                      $0.00

 

  45     UNIVERSITY OF ILLINOIS                                      

                                                                                                                                   Filed:

  A letter was received dated April 28, 2009 reporting the Actual cost of item #21 in our April 15, 2009

  report as $41,396.04.

   Signed By: Philip Abruzzi, SPO Designee

      Vendor:  Fifth Alder Associates LP                                                       Notary Date:           3/17/2009

                                      Estimate                  Actual                                                  FY             QT

     State Cost:               $91,169.00              $41,396.04                                                  9                4

     Federal Cost                    $0.00                      $0.00

7/15/2009                                                            rptQuarterlyW                                                       Page 20 of  20