LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  1       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       10/1/2009

  The emergency procurement of cellular services for cellular services in Region 5, for the 9-month period of

  October 1, 2009 - June 30, 2010, is necessary due to the fact that the solicitation for a new Statewide Cellular

  Services contract is currently in process.  It is anticipated that the intent to award as a result of the solicitation

  will be published this week; however, we must maintain critical services while contract negotiations occur and

  until such time that the new contract can be executed.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Illinois Valley Cellular                                                             Notary Date:           9/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $17,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  2       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       10/1/2009

  The emergency procurement of cellular services for cellular services in Region 1-4 & 6, for the 9-month period

  of October 1, 2009 - June 30, 2010, is necessary due to the fact that the solicitation for a new Statewide

  Cellular Services contract is currently in process.  It is anticipated that the intent to award as a result of the

  solicitation will be published this week; however, we must maintain critical services while contract negotiations

  occur and until such time that the new contract can be executed.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Verizon Wireless                                                                    Notary Date:           9/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $4,550,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 1 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  3       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       10/1/2009

  The emergency procurement of cellular services for cellular services in Region 7, for the 9-month period of

  October 1, 2009 - June 30, 2010, is necessary due to the fact that the solicitation for a new Statewide Cellular

  Services contract is currently in process.  It is anticipated that the intent to award as a result of the solicitation

  will be published this week; however, we must maintain critical services while contract negotiations occur and

  until such time that the new contract can be executed.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  AT&T                                                                                   Notary Date:           9/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $60,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  4       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       10/1/2009

  The emergency procurement of cellular services for Sprint/Nextel Push-To-Talk feature, for the 9-month period

   of October 1, 2009 - June 30, 2010, is necessary due to the fact that the solicitation for a new Statewide

  Cellular Services contract is currently in process.  It is anticipated that the intent to award as a result of the

  solicitation will be published this week; however, we must maintain critical services while contract negotiations

  occur and until such time that the new contract can be executed.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Sprint/Nextel                                                                          Notary Date:           9/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $570,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 2 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  5       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/17/2009

  An emergency contract for Network Master Services is necessary for a period of 12 months to allow for the

  solicitation, award and implementation of any replacement contract(s) as a result of RFP 08-31864.

   Signed By: Gwyn Gurgens, State Purchasing Officer

      Vendor:  AT&T Global Services                                                           Notary Date:         12/16/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:         $27,600,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  6       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/17/2009

  An emergency contract for Network Master Services is necessary for a period of 12 months to allow for the

  solicitation, award and implementation of replacement contract(s) as a result of RFP 08-31864.

   Signed By: Gwyn Gurgens, State Purchasing Officer

      Vendor:  Sprint                                                                                     Notary Date:         12/16/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $3,732,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 3 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  7       CONSERVATION - NATURAL RESOURCES                           

                                                                                                                                   Filed:       10/7/2009

  This emergency project will allow for the clean-up of trees and debris from a May 8, 2009 severe storm which

  caused damage to two Parks, Giant City State Park and Lake Murphysboro State Park.  FEMA declared those

  areas federal disaster areas on July 2, 2009.  The Department of Natural Resources staff have been working

  with FEMA to determine what damage is eligible for federal reimbursement.

   Signed By: Norm Dixon, SPO

      Vendor:  Various                                                                                  Notary Date:           10/6/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $59,045.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  8       CONSERVATION - NATURAL RESOURCES                           

                                                                                                                                   Filed:      10/27/2009

  This emergency project will allow for the repairs required from a May 8, 2009 severe storm which caused

  damage to two parks, Giant City State Park and Lake Murphysboro State Park.  FEMA declared those areas

  federal disaster areas on July 2, 2009.  The Department of Natural Resources staff have been working with

  FEMA to determine what damage is eligible for federal reimbursement.

   Signed By: Norm Dixon, SPO

      Vendor:  Various                                                                                  Notary Date:         10/26/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $55,625.00              $55,625.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 4 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  9       NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:       12/2/2009

  There is substantial evidence that Asian Carp are in the vicinity of the US Army Corps of Engineers electronic

  dispersal barrier, known as Barrier IIA, on the Chicago Sanitary and Ship Canal near Romeoville, Illinois.

  Operated to prevent an Asian Carp incursion into Lake Michigan and then on to the rest of the Great Lakes. 

  The electric Barrier IIA must be shut down now for repair and maintenance before weather conditions make

  that action impossible.  The potential for the fish to by-pass the barrier using flood water connections between

  the DesPlaines River, the Chicago Sanitary and Ship Canal and associated waterways is possible.  Asian Carp

  can devastate native populations as well as cause great economic damage to the Great Lakes commercial, sport

  and tribal fisheries collectively valued at more than $7 billion annually.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Various                                                                                  Notary Date:         11/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $939,768.58                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  10     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:       12/3/2009

  This purchase is to utilize the Wetland Reserve Program Federal Funds.  The seed is intended to establish

  wetlands at the Mississippi River Area.  This project is supportive of the State's constitutional right to a

  healthy environment, the DNR's mission to manage, protect and sustain Illinois' natural and cultural resources

  and the Division Land Management focus to protect, restore and promote the responsible use of Illinois' natural

   resources.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Vienna Nursery                                                                      Notary Date:           12/2/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $82,552.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 5 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  11     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/29/2009

  Special made classification folders are needed for our Record Office in order to be in compliance with our

  Administrative Directive.  Stateville uses between 300 and 600 folders per week and they currently have on

  hand one month's supply.  The State master contract with Logans Marketing was cancelled due to the vendor

  not delivering.  A multi-year contract will need to be established by CMS and this will take a few months

  before it is in place.  This purchase will be shared between four facilities (Stateville, Graham, Dwight and

  Vienna).

   Signed By: Anthony Ramos, Warden

      Vendor:  Meadow Office Supply                                                           Notary Date:         10/15/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $64,600.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  12     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/29/2009

  The facility steam and hot water is distributed and returned to the Boiler House by means of overhead and

  underground  fiberglass piping.  This fiberglass piping was installed in 1988 and has been a continuous

  maintenance issue since.  There are frequent breaks in these lines interrupting supply of hot water to various

  building throughout the institution including all cell houses and dietary water systems.  When these breaks do

  occur, they are very difficult to repair due to the piping being constructed of fiberglass and the limited means of

   repairing it.  All piping located in the utility tunnel should be replaced so the cell houses utilities and services

  are not interrupted.

   Signed By: Donald Gaetz, Warden

      Vendor:  Unknown                                                                               Notary Date:           8/20/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $100,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 6 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  13     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/29/2009

  The tar and gravel roof of the Old Academic building leaks whenever a heavy snow fall melts.  The EPDM roof

  over the chapel area has been repaired twice.  It is leaking at the time of this request, requiring two woodshops

  to relocate.  The chapel area is also leaking on the northwest corner.  There is a connecting two story hallway

  between the two buildings.  It is recommended to replace both roofs and connecting roofs.

   Signed By: Bobby Moore, Superintendent

      Vendor:  Elens & Maichin Roofing                                                        Notary Date:           10/5/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $134,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  14     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       10/5/2009

  To establish an emergency purchase for fully baked Sugar Cookies to meet Illinois Department of Corrections

  needs.  Fully baked sugar cookies are required to provide cookies to Illinois Department of Corrections, Illinois

  Department of Human Services, Illinois Department of Juvenile Justice, Illinois Department of Veterans

  Affairs and various local school districts.  The emergency purchase is the result of cookie production

  equipment breakdown and greater than expected increase in production due to various vendors' non delivery of

  canned dessert items, and dated bakery equipment in need of repair.

   Signed By: Donna Lindemulder, Sr. Public Service Admin.

      Vendor:  Pure Food Specialties Inc.                                                       Notary Date:           9/15/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $44,226.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 7 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  15     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       10/5/2009

  The X-house which houses 450 residents has no operable hot water heaters (both are down). The institution is

  unable to move the 450 residents due to the R&C classifications.  The event poses a safety and sanitation issue

  which should require immediate corrective action.

   Signed By: Andrew Ott, Warden

      Vendor:  McGuire Sales Company                                                         Notary Date:             7/1/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $60,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  16     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       10/5/2009

  The water heater that supplies domestic hot water to the dietary has developed a leak around the copper clad

  tubes and steel tube sheet.  Water is spraying on the gas burners.  The unit is no longer in service and must be

  replaced.

   Signed By: John Evans, Warden

      Vendor:  Unknown                                                                               Notary Date:           8/10/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $39,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 8 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  17     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       10/8/2009

  Continued deterioration of Dietary Boiler and Piping has become operationally unreliable and can't keep up

  with the steam demand of dietary apparatuses.  The failure of this system would prohibit dietary from

  preparing food and sanitizing dishes for approximately 1,825 inmates.

   Signed By: Keith Anglin, Acting Warden

      Vendor:  Unknown                                                                               Notary Date:           9/18/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $150,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  18     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       11/6/2009

  To establish an emergency purchase for service and repair parts to the Weiler Meat grinder in order to fulfill

  ICI's commitment to current and future orders with the Department of Corrections and throughout the State of

  Illinois.

   Signed By: Donna Lindemulder, Senior Public Serv. Admin.

      Vendor:  Weiler An Company Inc.                                                        Notary Date:         10/14/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $33,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                        Page 9 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  19     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       11/6/2009

  The Illinois Youth Center St. Charles had a recent successful suicide.  The suicide was facilitated by the youth

  using the current style of bed which is a double bunk.  This double bunk places the facility in a liable situation

  and the replacement of the bunk with the proposed single bed will provide the facility with a safer environment

   for the youths in its care.

   Signed By: Bobby Moore, Superintendent

      Vendor:  Various                                                                                  Notary Date:           10/1/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $77,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  20     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       11/6/2009

  To provide a non-alcohol based hand sanitizing product to customers of ICI.  Due to H1N1 pandemic the

  available inventories have been exhausted due to a nearly three-fold increase in demand.  This purchase insures

  adequate levels are maintained during the pandemic period until a term contract can be established through

  Central Management Services.  Items to be purchased are as follows:  85 drums of alcohol free hand sanitizer.

   Signed By: Donna Lindemulder, Sr. Public Service Admin.

      Vendor:  Every Bloomin Industrial Sup.                                                  Notary Date:         10/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $29,693.25                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 10 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  21     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/13/2009

  The current grease trap is over 25 years old and has original equipment.  Due to the age and from cleaning it on

  a regular basis, the trap is no longer functioning in the proper manner.  The grease is flowing around the baffle

  due to the walls of the grease trap eroding over the years.  Currently the rebar that makes up the walls of the

  grease trap are exposed from this erosion.  The trap just collapsed on one corner allowing ground water to enter

  and contaminated water exit to the surroundings.  An outside contractor will be needed to remove the old grease

   trap, purchase new one, and install the new one.  There will be a restricted time frame on the project due to the

   need of the grease trap during meal preparation.

   Signed By: Andrew Ott, Warden

      Vendor:  Unknown                                                                               Notary Date:           11/5/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $60,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  22     CORRECTIONS - GENERAL OFFICE                                

                                                                                                                                   Filed:      12/14/2009

  The water heater, located in the State laundry building is in need of replacement. The unit was installed at the

  time of facility construction in 1990.  Approximate cost of materials and labor is $47,000.  Materials to be

  purchased from Connor and Company.  Labor to be provided by F.J.Murphy.  Approval has been given to

  move forward by CPU #10-017.

   Signed By: Jerry Buscher, Warden

      Vendor:  Various                                                                                  Notary Date:         11/17/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $47,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 11 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  23     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/21/2009

  Dwight Correctional Center houses some 1100 offenders of which many are housed in the seven south end

  cottages built in the 1930's and are historic preservation buildings.  The Administration building is included in

  this group of which have slate roofs.  The slate roofs are in good shape but the rid caps have become worn and

  dislodged allowing water to run down the inside of and into the plaster walls.  This creates the situation that the

   walls become damp and mold is growing uncontrollably.  The Center is requesting this emergency to replace

  the rid caps on living unit C-1 through C-7 and the administration building.

   Signed By: Carolyn Trancoso, Warden

      Vendor:  Unknown                                                                               Notary Date:           12/8/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  24     EMPLOYMENT SECURITY, DEPARTMENT OF                         

                                                                                                                                   Filed:      10/26/2009

  Unemployment benefit claimants continue to encounter busy signals and other service interruptions when using

   the IDES' DVR (TeleServe) system to submit their bi-weekly certifications.  To ensure adequate capacity for

  claimants to use TeleServe.  IDES must upgrade its T1 infrastructure to a fiber based solution.  Claims volumes

  are continuing to rise and are not expected to peak until the first quarter of 2010.  Therefore, it is critical that

  this project be completed before January.  CMS has negotiated a master contract for electrical contracting work.

    However, the lessor has a right under the lease to refuse any vendor installing improvements to the leased

  premises.  The bid from the lessor's vendor is significantly less than the bid submitted by the master contract

  vendor.

   Signed By: Barry Isaacson, SPO

      Vendor:  One South State Street LLC                                                    Notary Date:         10/22/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $94,600.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 12 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  25     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       11/5/2009

  This is an emergency purchase affidavit for the replacement of the freezer at the Murray Developmental

  Center.  The current freezer is failing and repairing it is not feasible.  This freezer is used to store all frozen

  foods and meat used to feed the residents at the facility.

   Signed By: Curtis Thompson, State Purchasing Officer

      Vendor:  Various                                                                                  Notary Date:           11/5/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $85,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  26     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       11/9/2009

  This emergency purchase is for temporary chillers in the Goldman Building at the Elgin Mental Health Center. 

  The temporary chillers will allow time to repair the permanent units.

   Signed By: Curtis Thompson, State Purchasing Officer

      Vendor:  Anchor Mechanical                                                                Notary Date:           11/9/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $32,100.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 13 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  27     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      10/29/2009

  This is notice of the Illinois Department of Public Health's emergency procurement of equipment as part of an

  overall strategy to determine what influenza strains are present in Illinois, to obtain information on the number

  of cases of the different strains, and to determine what shifts in genetic makeup of the strains is occurring,

  which will determine the appropriate treatment.

   Signed By: Jessica Pickens, Acting Deputy Director

      Vendor:  Qiagen Inc.                                                                            Notary Date:           9/21/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $109,794.25                                                 10               2

     Federal Cost                    $0.00                      $0.00

  28     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      10/20/2009

  This is notice of the Illinois Department of Public Health's emergency procurement of equipment for H1N1

  Swine Origin Influenza Virus testing.

 

  A letter was received dated December 23, 2009 reporting the actual cost as $244,752.

   Signed By: Jessica Pickens, Acting Deputy Director

      Vendor:  Applied Biosystems                                                                Notary Date:           9/21/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $290,481.60             $244,752.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 14 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  29     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      11/12/2009

  Due to this year's threat of H1N1 influenza and the importance of getting a seasonal influenza vaccination, the

  Department has a critical need to inform the public about the necessity of getting a seasonal flu shot and an

  H1N1 vaccination when it is available, and the importance of following the three Cs - clean, cover and contain. 

  In order to reach the public with these messages, the Department needs the assistance of a media

  planning/buying firm to place radio/television ads throughout the State at the time the H1N1 vaccine becomes

  available.

   Signed By: Winfred Rawls, Deputy Director

      Vendor:  GMMB                                                                                  Notary Date:           11/6/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $1,750,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  30     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/23/2009

  The water make-up tank for the Department's Ash Street facility boiler is in critical failure and requires

  immediate replacement.  The tank is an integral part of the boiler system that provides heat to two buildings in

  the Ash Street facility.  The tank was scheduled for replacement in FY 11, however, is now in critical failure

  and the Department runs the risk of a serious disruption of State services, potential danger to public health, and

   further loss of property if the tank is allowed to completely fail.

   Signed By: Ann Schneider, Director

      Vendor:  E.L. Pruitt                                                                              Notary Date:         10/20/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $31,660.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 15 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  31     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      12/21/2009

  On November 19, 2009 the US Secretary of Transportation sent a letter to Governor Quinn stating all

  American Recovery and Reinvestment Act of 2009 (ARRA) funds not obligated by March 2, 2010 will be

  redistributed.  The immense effort required to coordinate the necessary Section 1512 Reporting required by

  ARRA is diverting precious human resources away from critical activities necessary to obligate and award

  ARRA projects before the March 2, 2010 deadline.  Quick action is necessary to avoid the loss of federal

  ARRA funds.

   Signed By: William Frey, Chief Assistant Engineer

      Vendor:  Capital Strategies                                                                    Notary Date:         12/15/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $175,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  32     HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:      10/23/2009

  Roof Replacement.

   Signed By: Karen Everingham, Executive Director

      Vendor:  Unknown                                                                               Notary Date:         10/22/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $325,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 16 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  33     ILLINOIS WORKERS' COMPENSATION COMMISSION

                                                                                                                                   Filed:       12/7/2009

  The IWCC receives tens of thousands of injury cases each year.  It is imperative to purchase new file jackets at

  the end of every year to file cases for the upcoming year.  These file jackets are color coded to match the

  current IWCC system and are used to hold all materials pertaining to each case.  As the IWCC is statutorily

  required to maintain case files on site for several years, these file jackets act as the primary organization and

  retention method.  If the IWCC is not allowed to purchase the folders it will not be able to meet statutory

  requirements.  The IWCC started bidding out this project at the end of October through CMS Printing. 

  Unfortunately that bidding did not produce a compliant bidder when it closed 11-25-09.  Therefore with the

  limited time remaining before the end of the calendar year, the agency is forced to procure these folders through

  an emergency purchase.  The emergency procurement is necessary because the agency does not have time to do

  a complete rebid.  If the IWCC does not have these folders before the start of 2010, there will be no way to

  track new cases filed with our Commission.

   Signed By: Katherine Melford, State Procurement Officer

      Vendor:  Ellis Systems Corp.                                                                 Notary Date:           12/4/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $15,110.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  34     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       12/3/2009

  Maintenance services on the University's PeopleSoft software are necessary for the financial and student

  computerized systems.  The contract for these services must be continuous.  Due to a delay by the vendor in

  providing a correct contractual document, this continuity in maintenance services was jeopardized.

   Signed By: Eddie Williams, Exec. VP

      Vendor:  Oracle USA, Inc.                                                                   Notary Date:         11/25/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $65,062.60                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 17 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  35     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      11/25/2009

  The vendor is able to schedule media advertisements in the fastest and most efficient manner to reach potential

  students for the coming academic year for the university to be competitive with other institutions.  Not placing

  the advertisements in a timely manner will have a serious negative impact on a scheduled recruiting open house

  and an undergraduate application deadline, resulting in a detrimental loss of potential students and the resulting

  income to the university.

   Signed By: Eddie Williams, Exec. VP

      Vendor:  Morning Star Media Group Ltd.                                               Notary Date:         11/23/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $93,050.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  36     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/14/2009

  The services of Air Fax Inc. were engaged for charter service to transport members of the University football

  team to the International Bowl in Toronto, Ontario on December 29, 2009 and January 2, 2010.  There was

  insufficient time to bid this purchase from the time the University was invited to partipate in the bowl game.

   Signed By: Eddie Williams, Exec. VP

      Vendor:  Air Fax Inc.                                                                           Notary Date:         12/10/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $115,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 18 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  37     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/23/2009

  Software and maintenance services for the university's Enterprise Resource Planning System are necessary to

  upgrade and maintain the HR, financial and student computerized systems.  A purchase order had to be

  immediately issued to obtain package pricing before Oracle's deadline.

   Signed By: Eddie Williams, Vice President

      Vendor:  Oracle USA, Inc.                                                                   Notary Date:         12/14/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00          $1,315,864.24                                                 10               2

     Federal Cost                    $0.00                      $0.00

  38     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/23/2009

  Consulting and advisory services are required for the University's Oracle Enterprise Portal software.  A

  purchase order had to be immediately issued to obtain pricing before CIBER's deadline.

   Signed By: Eddie Williams, Vice President

      Vendor:  CIBER                                                                                  Notary Date:         12/18/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $49,000.00                                                                               10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 19 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  39     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/23/2009

  The services of Sheraton Centre Tornoto were engaged for lodging and meals for the University's football team

  (four nights) and lodging for the band, cheerleaders and fan package (two nights) while the team plays in the

  International Bowl on January 2, 2010 in Toronto, Ontario,  There was insufficient time to bid this purchase

  from the time the University was invited to participate in the bowl game.

   Signed By: Eddie Williams, Vice President

      Vendor:  Sheraton Centre Toronto                                                         Notary Date:         12/18/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $150,680.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  40     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      11/18/2009

  On May 8, 2009, a severe wind storm with gusts recorded as high as 106 mph hit the campus of Southern

  Illinois University Carbondale.  It is currently estimated that the campus sustained approximately $10 million

  in damages.  During the past several months, University officials have been assessing the damage and the

  necessary repairs.  The Administration consulted with the insurance carrier, adjustors, and architects/engineers

  to determine the scope of work necessary to repair the buildings.  An independent firm has determined that it is

   necessary to replace six building roofs before the onset of winter to protect the property against further

  damage.

   Signed By: Kevin Bame, State Purchasing Officer

      Vendor:  Jim Taylor Inc.                                                                       Notary Date:         11/12/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $1,310,227.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 20 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  41     SOUTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      11/18/2009

  On May 8, 2009, a severe wind storm with gusts recorded as high as 106 mph hit the campus of Southern

  Illinois University Carbondale.  It is currently estimated that the campus sustained approximately $10 million

  in damages.  During the past several months, University officials have been assessing the damage and the

  necessary repairs.  The Administration consulted with the insurance carrier, adjustors, and architects/engineers

  to determine the scope of work necessary to repair the buildings.  An independent firm has determined that it is

   necessary to replace six building roofs before the onset of winter to protect the property against further

  damage.

   Signed By: Kevin Bame, State Purchasing Officer

      Vendor:  Needham Roofing, Inc.                                                           Notary Date:         11/12/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $461,890.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  42     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       10/6/2009

  This emergency expenditure is for the purchase of hardware and software maintenance support for the IBM

  POWER5 system (named Blue Print) for the National Center for Supercomputing Applications (NCSA).

   Signed By: Mike Devocelle, SPO

      Vendor:  IBM                                                                                      Notary Date:           10/2/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $813,410.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 21 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  43     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      11/30/2009

  UIUC maintains an Integrity Management Plan of the UI transmission pipeline as required by the US DOT,

  Pipeline and Hazardous Materials Safety Administration, Pipeline Safety Regulations part, Subpart O, Gas

  Transmission Pipeline Integrity Management.  The Integrity plan and the tasks required under the plan are

  reviewed annually by an onsite audit of the Illinois Commerce Commission Pipeline Safety Section.  On 10-27-

  09 a preliminary report was received and this report identified 10 anomalies that require immediate attention.

   Signed By: Maxine Sandretto, SPO

      Vendor:  TDW Pipeline Services                                                           Notary Date:         11/23/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  44     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      11/24/2009

  The Krannert Center for Performing Arts Playhouse Theater experienced a flood causing damage to one of the

  stage lifts.  As a result of the water damage the lift motor, brake and drive shaft were all compromised.  In its

  current condition, the system will not brake the lift.  This could cause the lift to either cease or collapse into the

   stage pit.  This has the potential to risk injury to students and employees.  It is essential that a permanent

  repair be done as soon as possible to ensure safety.  Failure to perform necessary installation and repairs will

  also result in loss of revenue and interruption of services for scheduled performances.  Gala Systems Inc. is the

  manufacturer of the lift and the only authorized installer to do its repair.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Gala Systems Inc.                                                                   Notary Date:         11/18/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $59,000.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 22 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  45     AGRICULTURE -  GENERAL OFFICE                              

                                                                                                                                   Filed:       9/11/2008

  A letter was received dated November 4, 2009 reporting the actual cost of item #3 in our October 15, 2008

  report as $391,719.

   Signed By: Thomas Jennings, Executive Director

      Vendor:  Unknown                                                                               Notary Date:           9/11/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $250,000.00             $391,719.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  46     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #10 in our January 15, 2009 report

  as $4,688,491.15.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Verizon Wireless                                                                    Notary Date:         12/12/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $6,000,000.00          $4,688,491.15                                                 10               2

     Federal Cost                    $0.00                      $0.00

  47     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #11 in our January 15, 2009 report

  as $916,256.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Sprint/Nextel                                                                          Notary Date:         12/12/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $915,000.00             $916,256.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 23 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  48     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #12 in our January 15, 2009 report

  as $20,748.88.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  Illinois Valley Cellular                                                             Notary Date:         12/12/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $30,000.00              $20,748.88                                                 10               2

     Federal Cost                    $0.00                      $0.00

  49     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2008

  A letter was received dated March 3, 2009 reporting the actual cost of item #9 in our January 15, 2009 report

  as $115,032.46.

   Signed By: Gwyn Gurgens, Acting SPO

      Vendor:  AT&T                                                                                   Notary Date:         12/12/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $134,000.00             $115,032.46                                                 10               2

     Federal Cost                    $0.00                      $0.00

  50     CONSERVATION - NATURAL RESOURCES                           

                                                                                                                                   Filed:         8/2/2008

  A letter was received dated 10-21-09 reporting the actual cost of item #6 in our October 15, 2008 report as

  $23,935.00.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Bric Partnership LLC                                                             Notary Date:           8/22/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $20,000.00              $23,935.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 24 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  51     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       7/25/2008

  A letter was received dated November 24, 2009 reporting the actual cost of item #8 in our October 15, 2008

  report as $22,333.10.

   Signed By: Lee Ryker, Warden

      Vendor:  Various                                                                                  Notary Date:           6/18/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $24,500.00              $22,333.10                                                 10               2

     Federal Cost                    $0.00                      $0.00

  52     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       2/27/2009

  A letter was received dated 11-24-09 stating that item #8 in our April 15, 2009 report was cancelled.

   Signed By: Donald Gaetz, Acting Warden

      Vendor:  Unknown                                                                               Notary Date:             2/9/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $32,520.00                      $0.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  53     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       4/29/2009

  A letter was received dated 11-24-09 reporting the actual cost of item #10 in our July 15, 2009 report as

  $213,672.15.

   Signed By: Donna Lindenmulder, Senior Public Ser. Admin.

      Vendor:  Midwest Quality Foods                                                           Notary Date:           4/22/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $236,480.00             $213,672.15                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 25 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  54     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       11/7/2008

  A letter was received dated 11-24-09 reporting the actual cost of item #18 in our January 15, 2009 report as

  $50,940.81.

   Signed By: Frank Shaw, Warden

      Vendor:  CARROM Construction                                                          Notary Date:         10/24/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $57,498.75              $50,940.81                                                 10               2

     Federal Cost                    $0.00                      $0.00

  55     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/31/2008

  A letter was received dated 11-24-09 reporting the actual cost of item #17 in our January 15, 2009 report as

  $228,436.36.

   Signed By: Frank Shaw, Warden

      Vendor:  Various                                                                                  Notary Date:         10/22/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $222,271.50             $228,436.36                                                 10               2

     Federal Cost                    $0.00                      $0.00

  56     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/31/2008

  A letter was received dated 11-24-09 reporting the actual cost of item #16 in our January 15, 2009 report as

  $82,563.50.

   Signed By: Frank Shaw, Warden

      Vendor:  Easter Owens Integrated System                                             Notary Date:         10/17/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $65,000.00              $82,563.50                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 26 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  57     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       8/29/2008

  A letter was received dated 11-24-09 reporting the actual cost of item #11 in our October 15, 2008 report as

  $376,327.02.

   Signed By: Lisa Nordstrom, Superintendent

      Vendor:  Patton Power Systems                                                            Notary Date:           8/25/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $800,000.00             $376,327.02                                                 10               2

     Federal Cost                    $0.00                      $0.00

  58     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/31/2008

  A letter was received dated 11-24-09 reporting the actual cost of item #15 in our January 15, 2009 report as

  $24,751.70.

   Signed By: Lee Ryker, Warden

      Vendor:  Anthony Supply Company, Inc.                                                Notary Date:         10/17/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,000.00              $24,751.70                                                 10               2

     Federal Cost                    $0.00                      $0.00

  59     EMPLOYMENT SECURITY, DEPARTMENT OF                         

                                                                                                                                   Filed:       6/12/2009

  A letter was received dated October 21, 2009 reporting the actual cost of item #16 in our July 15, 2009 report

  as $30,264.71.

   Signed By: Barry Isaacson, State Purchasing Officer

      Vendor:  Bowe Bell & Howell                                                              Notary Date:           6/10/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $30,000.00              $30,264.71                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 27 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  60     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:         7/9/2009

  A letter was received dated October 20, 2009 reporting the actual cost of item #20 in our October 15, 2009

  report as $209,999.46.

   Signed By: Alan Biggerstaff, Deputy Director

      Vendor:  Illinois Public Health Assn.                                                      Notary Date:             7/7/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $210,000.00             $209,999.46                                                 10               2

     Federal Cost                    $0.00                      $0.00

  61     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:       5/21/2009

  A letter was received dated October 21, 2009 reporting the actual cost of item #17 in our July 15, 2009 report

  as $48,787.80.

   Signed By: Alan Biggerstaff, Deputy Director

      Vendor:  RCOHE Diagnostics Corp.                                                     Notary Date:           5/18/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $40,000.00              $48,787.80                                                 10               2

     Federal Cost                    $0.00                      $0.00

  62     REVENUE, DEPARTMENT OF

                                                                                                                                   Filed:       12/4/2008

  A letter was received dated December 28, 2009 reporting the actual cost of item #25 in our January 15, 2009

  report as $19,000.

   Signed By: Norma Sutton, SPO

      Vendor:  Hill Taylor LLC                                                                      Notary Date:           12/3/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $20,000.00              $19,000.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 28 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  63     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:         6/4/2009

  A letter was received dated October 8, 2009 reporting the actual cost of item #23 in our July 15, 2009 report as

   $110,183.74.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Uretek USA Inc.                                                                    Notary Date:           3/23/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $200,000.00             $110,183.74                                                 10               2

     Federal Cost                    $0.00                      $0.00

  64     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:         9/5/2008

  A letter was received dated October 30, 2009 reporting the actual cost of item #26 in our October 15, 2008

  report as $1,930,663.27.

   Signed By: Roger Driskell, Deputy Director

      Vendor:  Unknown                                                                               Notary Date:           8/18/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $3,500,000.00          $1,930,663.27                                                 10               2

     Federal Cost                    $0.00                      $0.00

  65     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       8/27/2008

  A letter was received dated October 30, 2009 reporting the actual cost of item #28 in our October 15, 2008

  report as $535,704.60.

   Signed By: Mary Lamie, Deputy Director

      Vendor:  Keeley and Sons, Inc.                                                             Notary Date:           8/14/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $750,000.00             $535,704.60                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 29 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  66     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       9/29/2008

  A letter was received dated October 30, 2009 reporting the actual cost of item #29 in our October 15, 2008

  report as $585,797.16.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Areatha Construction                                                              Notary Date:             9/8/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $700,000.00             $585,797.16                                                 10               2

     Federal Cost                    $0.00                      $0.00

  67     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/30/2008

  A letter was received dated October 30, 2009 reporting the actual cost of item #27 in our January 15, 2009

  report as $5,764,817.15.

   Signed By: Mary Lamie, Deputy Director

      Vendor:  Baxmeyer Construction, Inc.                                                   Notary Date:           10/7/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $6,200,000.00          $5,764,817.15                                                 10               2

     Federal Cost                    $0.00                      $0.00

  68     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       10/7/2008

  A letter was received dated October 30, 2009 reporting the actual cost of item #28 in our January 15, 2009

  report as $119,319.24.

   Signed By: Mary Lamie, Deputy Director

      Vendor:  C.E. Mahoney Company                                                         Notary Date:           9/19/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $175,000.00             $119,319.24                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 30 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  69     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       10/7/2008

  A letter was received dated October 30, 2009 reporting the actual cost of item #29 in our January 15, 2009

  report as $87,265.00.

   Signed By: Mary Lamie, Deputy Director

      Vendor:  Carl Bannister Excavating Ser.                                                Notary Date:           9/19/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $165,000.00              $87,265.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

  70     ILLINOIS WORKERS' COMPENSATION COMMISSION

                                                                                                                                   Filed:      11/10/2005

  A letter was received dated November 2, 2009 reporting the actual cost of item #35 in our January 13, 2006

  report as $115,196.33.

   Signed By: Dennis Ruth, Chairman

      Vendor:  Midwest Comp Review Services                                             Notary Date:           10/4/2005

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00             $115,196.33                                                 10               2

     Federal Cost                    $0.00                      $0.00

  71     ILLINOIS WORKERS' COMPENSATION COMMISSION

                                                                                                                                   Filed:       12/2/2005

  A letter was received dated November 2, 2009 reporting the actual cost of item #36 in our January 13, 2006

  report as $197,505.

   Signed By: Dennis Ruth, Chairman

      Vendor:  Ingenix Health Intelligence                                                      Notary Date:         11/30/2005

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $78,600.00             $197,505.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 31 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  72     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:       9/25/2008

  A letter was received dated 11-30-09 reporting the actual cost of item #38 in our October 15, 2008 report as

  $1,132,883.24.

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  International Salt Company                                                      Notary Date:             9/8/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $1,136,400.00          $1,132,883.24                                                 10               2

     Federal Cost                    $0.00                      $0.00

  73     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:         9/2/2008

  A letter was received dated 11-30-09 reporting the actual cost of item #37 in our October 15, 2008 report as

  $1,692,526.04.

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  International Salt Company                                                      Notary Date:             9/2/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $1,708,000.00          $1,692,526.04                                                 10               2

     Federal Cost                    $0.00                      $0.00

  74     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:         2/2/2009

  A letter was received dated 12-2-09 reporting the actual cost of item #17 in our April 15, 2009 report as

  $35,675.

   Signed By: Tracey Smith, Chief of Administration

      Vendor:  National Restoration Systems                                                  Notary Date:             1/6/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $35,675.00              $35,675.00                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 32 of  33


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2009 through December 31, 2009

  75     ILLINOIS STATE UNIVERSITY                                  

                                                                                                                                   Filed:       9/29/2009

  A letter was received dated October 19, 2009 reporting the actual cost of item #33 in our October 15, 2009

  report as $81,623.85.

   Signed By: Judy Johnson, Director

      Vendor:  Stalker Flooring                                                                      Notary Date:           9/28/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,471.85              $81,623.85                                                 10               2

     Federal Cost                    $0.00                      $0.00

  76     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/16/2009

  A letter was received dated October 2, 2009 reporting a revised actual amount for item #38 in our October 15,

  2009 report as $222,445.21.

   Signed By: Mike Devocelle, SPO Designee

      Vendor:  SonTek/YSI Incorporated                                                       Notary Date:           7/14/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $222,288.00             $222,445.21                                                 10               2

     Federal Cost                    $0.00                      $0.00

1/12/2010                                                           rptQuarterlyWe                                                      Page 33 of  33