LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  1       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:      10/13/2010

  Staff from the Office of the Auditor General is performing the state compliance examination of the Illinois

  Department of Transportation for the year ended June 30, 2010.  In addition, the Office of the Auditor General

  has contracted special assistant auditors from the firm of Sikich LLP to perform the financial audit of the Dept.

  of Transportation for the year ended June 30, 2010.  Further, certain Auditor General staff that were assigned

  to perform some aspects of the state compliance examination have left the Office for other employment

  opportunities.  The departure of Auditor General staff has negatively impacted resources available for planned

  work.  As a result, remaining Auditor General staff assigned to Dept. of Transportation state compliance

  examination will be supplemented with external resources from the firm of Sikich LLP.

   Signed By: Bruce Bullard, Director

      Vendor:  Sikich LLP                                                                             Notary Date:         10/13/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $32,960.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  2       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:       11/4/2010

  30 ILCS 5/3-2.1 states "The Auditor General shall conduct a change over audit of the State Treasurer's

  accounts at the conclusion of each term of Office of the State Treasurer or, in the case of successive terms by a

  State Treasurer, at the conclusion of that State Treasurer's time in office."  The special assistant auditors

  currently performing the Office of the Treasurer's audits at June 30, 2010 is Crowe Horwath LLP.  The firm has

   experience with the Office of the Auditor General's audit program and a current understanding of operations in

  the Office of the Treasurer.  To properly complete the turnover audit the engagement needs to begin as soon as

  possible.  A fair and reasonable price was negotiated with Crowe Horwath LLP which has sufficient staff and

  expertise to perform this engagement and begin work within the necessary timeframe to avoid serious disruption

   in OAG audit services.

   Signed By: Bruce Bullard, Director

      Vendor:  Crowe Horwath LLP                                                              Notary Date:           11/4/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $342,600.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 1 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  3       AUDITOR GENERAL -  OFFICE OF THE                            

                                                                                                                                   Filed:      12/28/2010

  To properly conduct the required agreed upon procedures of the Illinois Office of the Comptroller - Transfer of

  administrations, the special agreed upon procedures need to begin as soon as possible.  Following internal

  discussions, it was determined that we did not have sufficient internal staff resources to conduct the engagement

  within the required timeframes.  Insufficient time exists to conduct the usual request for proposals competitive

  selection process prior to the transfer of administrations on January 10, 2011.  A fair and reasonable price was

  negotiated with Sikich LLP, which has experience with the Office of the Auditor General's program and has

  sufficient staff and expertise to perform the special agreed upon procedures and begin work within the

  necessary timeframe to avoid serious disruption in OAG services.

   Signed By: Bruce Bullard, Director

      Vendor:  Sikich LLP                                                                             Notary Date:         12/28/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $44,240.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  4       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2010

  The emergency procurement of network services voice and data communications from Sprint for the next 3

  month period of December 16, 2010 - March 15, 2011, is necessary due to the fact that the award notice for

  the solicitation for a new Statewide Telecom Network Voice & Data Services contract was posted to the

  Illinois Procurement Bulletin on 12-8-10.  Network services voice and data communications are essential to

  State government business.

   Signed By: Gwyn Gurgens, SPO

      Vendor:  Sprint Communications                                                            Notary Date:         12/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $899,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 2 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  5       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2010

  The emergency procurement of network services voice and data communications from AT&T for the next 3

  month period of December 16, 2010 - March 15, 2011, is necessary due to the fact that the award notice for

  the solicitation for a new Statewide Telecom Network Voice & Data Services contract was posted to the

  Illinois Procurement Bulletin on 12-8-10.  Network services voice and data communications are essential to

  State government business.

   Signed By: Gwyn Gurgens, SPO

      Vendor:  AT&T Global Services                                                           Notary Date:         12/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $6,867,318.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  6       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/15/2010

  The emergency procurement of Centrex services from AT&T for the 3 month period of December 16, 2010  -

  March 15, 2011 is necessary due to the fact that the award notice for the solicitation for a new Statewide

  Telecom Network Voice & Data Services contract was posted to the Illinois Procurement Bulletin on 12-8-10.

    This emergency procurement is intended to allow time for a Statewide Telecom Network Voice & Data

  Services contract to be negotiated and executed.

   Signed By: Gwyn Gurgens, SPO

      Vendor:  AT&T Global Services                                                           Notary Date:         12/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $2,218,118.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 3 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  7       CHILDREN AND FAMILY SERVICES, DEPARTMENT OF         

                                                                                                                                   Filed:       10/1/2010

  DCFS is requesting the new contract based on the immediate need to continue Chrysalis services in the process

   of maintaining and transferring a centralized database to assist the Agency Performance Team's protocol

  collection work from vendor to be hosted by DCFS and also provide transition services to new vendor (if

  necessary) from FY 09 competitive bid process (RFP).

   Signed By: Sharon Clanton, SPO

      Vendor:  Chrysalis Consulting Co.                                                         Notary Date:           9/30/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $542,659.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  8       NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:      10/14/2010

  The Department was asked to disclose all intangible assets that may be applicable as well as assets values and

  amortization to the Office of the Comptroller by September 15, 2010 so that the State may be in compliance

  with GASB 51.  This standard requires that intangible assets such as internally generated computer software,

  easements, water rights, timber rights, mineral rights, patents, trademarks and copyrights be reported as capital

  assets.  The Department has a very large quantity of intangible assets.  The Department requires assistance to

  complete the tasks in a timely fashion as required.

   Signed By: Norm Dixon, SPO

      Vendor:  Crowe Horwath LLP                                                              Notary Date:         10/13/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $95,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 4 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  9       DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:      12/16/2010

  The main dishwasher is not working properly.  The facility houses approximately 275 youth which are served 3

  meals a day, and the trays, plastic glasses and plastic sporks must be washed after every meal.  The dishwasher

   leaks water during the rinse phase, and can no longer be repaired due to its age.  Due to the rusted out frame

  which is causing the leaking, there is a fire hazard as the water is spraying directly onto electrical outlets.  The

  solenoid valves have all gone bad, and the booster pumps need to be replaced at a cost of $4,000 and they

  have been repaired and/or replaced several times over the last 20 years.

   Signed By: Steven Strock, Business Administrator

      Vendor:  Cooks Correctional                                                                 Notary Date:           12/8/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  10     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/27/2010

  The current Master Contract vendor will not deliver due to non-payment of invoices.  Menard Corr. Center has

   been on lockdown since October 14, 2010 due to assaults to staff.  Foam trays are needed to serve meals to

  inmates in their cells whenever the facility is in lockdown.  If the institution continues at the same rate of use, they

   will use their present supply in approximately one week.

 

  A letter was received dated October 26, 2010 reporting the actual cost as $36,045.00.

   Signed By: David Rednour, Warden

      Vendor:  Unknown                                                                               Notary Date:         10/20/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $38,952.00              $36,045.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 5 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  11     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/12/2010

  Our agency is in the process of reviewing all programmatic contracts in order to increase transparency.  This

  review process will include competitive bidding out the contract.  Our current vendor has been designated as a

  sole sources vendor but we are seeking to competitive bid out the services.  Our contract with TASC will

  expire on 9-30-10 but services are still needed while the bid process is pending.  We intend to procure a

  contract with a vendor to provide substance abuse screenings and assessments for inmates during intake at

  Stateville, Menard, Dwight and Graham Correctional Centers.  The overall goal of this project is to reduce drug

   use/abuse and criminal behavior, while incarcerated, through comprehensive screening and assessment,

  cognitive restructuring, and an intensive substance abuse intervention program.  These screenings are required in

   order to identify those inmates in need of substance abuse treatment incarceration.

   Signed By: Marcus Hardy, Warden

      Vendor:  TASC Inc.                                                                             Notary Date:           9/21/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $103,550.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  12     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/27/2010

  Damage to Housing Unit 4 roof requiring replacement of entire roof system and related mechanical equipment

  including exhaust fans, fresh air fans and skylights.  The condition of the affected housing unit wing,

  encompassing 91 bed spaces is presently uninhabitable until the above referenced repairs are completed.

   Signed By: Lee Ryker, Warden

      Vendor:  Various                                                                                  Notary Date:         10/27/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $200,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 6 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  13     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       10/5/2010

  Currently, Illinois Correctional Industries does not have a cardboard contract in place.  As a result, several lines

   of our box operation at the Danville ICI shop are at a stand still.

 

  A letter was received dated October 7, 2010 reporting the actual cost as $25,893.38.

   Signed By: Neil Rossi, Regional Manager

      Vendor:  International Paper                                                                 Notary Date:           9/30/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00              $25,893.38                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  14     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       10/1/2010

  The overall goal of this project is to better prepare offenders for parole through intensive job preparedness

  training and continued job preparedness combined with job placement services in the high impact regions of the

  state in order to reduce recidivism and therefore reduce the number of admissions to IDOC so that prison bed

  space can be created and preserved for more violent offenders.  This emergency affidavit provides for a 90

  extension of the contract to ensure services continue while the Department restructures their community re-entry

   program in preparation for bidding out for future services.

   Signed By: Roberta Fews, Chief

      Vendor:  Safer Foundation                                                                    Notary Date:           9/30/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $133,900.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 7 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  15     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/14/2010

  The sliding windows in the 5 guard towers have worn tracks that are allowing the glass to fall out.  This issue is

  causing safety issues with the employees working these assignments.  The framework holding the glass is coming

   apart and does not allow the windows to slide open quickly as designed.  In the event of an emergency the

  windows are malfunctioning, which could potentially cause security problems as well.

 

  A letter was received dated November 17, 2010 reporting the actual cost as $24,934.00.

   Signed By: John Evans, Warden

      Vendor:  Marion Glass and Mirror                                                         Notary Date:         10/12/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $35,000.00              $24,934.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  16     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      10/19/2010

  Illinois Correctional Industries provides Dept. of Corrections with sheets and pillowcases which are cut at the

  garment shop located at Sheridan Correctional Center and sewn at Dwight Correctional Industries.  A

  contract is in place with Atlantic Textile Co.  They refuse to honor the terms.  IDOC will run out of sheets and

  pillowcases if this sheeting is not purchased at another vendor.

   Signed By: James Clinton, PSA

      Vendor:  American Textiles Systems                                                     Notary Date:         10/13/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $57,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 8 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  17     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       11/4/2010

  Damage to Housing Unit 4 roof requiring replacement of entire roof system and related mechanical equipment

  including exhaust fans, fresh air fans and skylights.  The condition of the affected housing unit wing,

  encompassing 91 bed spaces is presently uninhabitable until the above referenced repairs are completed.

   Signed By: Lee Ryker, Warden

      Vendor:  Various                                                                                  Notary Date:         10/27/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $200,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  18     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/19/2010

  Emergency purchase of 50 Lenovo ThinkPad laptops for new Parole Agents for the Illinois Department of

  Corrections.  IDOC cannot wait until CMS awards the new master contract as parole officers cannot complete

  their jobs without the laptops.

   Signed By: Larry Moritz, Telecommunication Manager

      Vendor:  CDS Office Technologies                                                       Notary Date:           11/9/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $63,250.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                       Page 9 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  19     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/22/2010

  Black Diamond Foods chose not to deliver NFDM as listed in the solicitation for bid and the contract.  NFDM

  powder must be labeled Grade A powder.  Have been told by CMS buyer, that the contract will have to be

  rebid.  ICI must have NFDM Grade A powder to reconstitute and process for the Dept. of Corrections as well

   as the Dept. of Human Services.  Bidding process for State contract will take months.  Purchase represents a

  90 day supply.

   Signed By: Tim Gleason, Chief Executive Officer

      Vendor:  Franklin Farms                                                                       Notary Date:         11/17/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $499,800.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  20     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/29/2010

  Emergency purchase of two Brocade Switches.  Failures are occurring with the current switches.  The current

  Brocade Switches are old, obsolete and no longer supported by Brocade.  IDOC no longer has any support on

   the old Brocade switches.

   Signed By: Larry Moritz, Telecommunication Manager

      Vendor:  S.E.A. Group                                                                         Notary Date:         11/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $39,130.92                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 10 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  21     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      11/22/2010

  Illinois Correctional Industries provides Department of Corrections with boxer shorts which are cut at the

  garment shop located at Sheridan Correctional Center and sewn at Centralia Correctional Industries.  A

  contract is in place with American Textile Systems.  They refuse to honor the terms, IDOC will run out of boxer

   shorts if this broadcloth is not purchased at another vendor.

   Signed By: James Clinton, PSA

      Vendor:  Arthur R. Johnson Co. Inc.                                                     Notary Date:         11/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $183,800.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  22     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/14/2010

  Currently the food products are on a master contract but due to the contract not being renewed this emergency

  purchase is required to eliminate the possibility of running out of food to feed approximately 1650 inmates; this

  causing a threat to the health and safety of both inmates and employees at this facility.  An order for the

  immediate purchase of canned goods is necessary.

   Signed By: John Cox, Warden

      Vendor:  Kohl's                                                                                    Notary Date:         12/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $34,293.84                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 11 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  23     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/16/2010

  Starting in January, 75 Parole Cadet's are entering the Training academy and are required to have all equipment

  needed for their new positions.  The CMS master contract has expired for all Public Safety Equipment and

  Apparel.  Therefore, the Department of Corrections is requesting an emergency purchase for the Parole agents

  equipment.  The items needed purchased are:  holster's, ammunition pouch's, hand cuff cases, mace holders, leg

   irons, pepper spray, body armor and supplies:  100 watt speakers, phantom max combo kits, power bright

  400 watt power inverters and security screen's for parole vehicles.

   Signed By: Michelle Grimsley, Purchasing Manager

      Vendor:  Gall's Inc.                                                                               Notary Date:         12/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $86,105.28                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  24     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/15/2010

  The previous contract renewal for Veggie Burger Mix was not approved in a timely manner by CMS.  CMS

  has informed Hill Industries that a new contract will have to bid.  ICI at Hill Industries has no inventory of this

  raw material, and the new contract has not been bid yet.  DOC is expecting ICI to produce this product to

  provide for the inmates on vegan diets through out the state.  Unless the emergency purchase is approved, ICI

  will leave its most important customer without the vegan product needed for third qt. of FY 2011.

   Signed By: Tim Gleason, Chief Executive

      Vendor:  Good Source Solutions                                                            Notary Date:           12/6/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $44,400.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 12 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  25     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/15/2010

  The electricity in the R-3 cell house was interrupted at around 8 a.m. on 12-4-10.  After assessing problem it

  was determined that the building transformer was blown.  The transformer will need to be replaced.  The

  building is currently running on a generator, but it is limited.,  There are no lights or power in the cells and only

  limited lighting in the remainder of the building.  There is heat and also hot water in the building.  We will need to

   hire an outside contractor to acquire a transformer and assist with installation.  We will also need to acquire an

  additional  generator to supply electricity to the cells if it is determined that it will be needed.  We will also need

  to supply fuel to the generators for as long as it is needed.

   Signed By: Keith Anglin, Warden

      Vendor:  Various                                                                                  Notary Date:           12/9/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $40,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  26     CORRECTIONS - GENERAL OFFICE                                

                                                                                                                                   Filed:       12/8/2010

  The current Substance Abuse Treatment Services contract is set to expire on 12-31-10.  All the required

  documents have been submitted to Central Office to post this contract out for bids.  OMB has not yet

  approved this contract for posting, therefore the Big Muddy River Correctional Center is requesting an

  emergency 90-day extension to the existing contract.

   Signed By: John Evans, Warden

      Vendor:  Jefferson County Comprehensive                                            Notary Date:           12/2/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $64,838.61                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 13 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  27     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/27/2010

  To attain an emergency purchase for ammunition due to the fact that there is no CMS master contract in place

  at this time.  This ammunition will be for the Training Academy, Parole Agents and all IDOC facilities.  In order

  to continue to facilitate usual operations for the Training Academy, Parole Divisional and the IDOC facilities, it is

  necessary to obtain this emergency purchase immediately.  There is a class of 75 Parole Cadets beginning

  January 3, 2011, who need to become certified in the weapons class by passing a range test before being

  certified.  Then, there will be another class of 140 Correctional Officer Cadets requiring certification in

  weaponry on January 11, 2011.  The current IDOC stock of ammunition has been depleted, causing an

  emergency situation to IDOC employees and staff for security reasons.  Facilities have had to shut down annual

  training because of the ammunition shortage.  The ammunition will be delivered to the Springfield Concordia

  Complex and distributed out as needed to the facilities.

   Signed By: Michelle Grimsley, Purchasing Manager

      Vendor:  Kiesler's Police Supply Inc.                                                     Notary Date:         12/16/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $519,805.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  28     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       10/7/2010

  After a RFP solicitation, the FY 11 contract was awarded to Canteen Correctional Services.  On June 30,

  2010 Canteen withdrew their bid and will not be contracting with TDF.  However, Canteen agreed to remain

  on the premises for up to 60 days so services are not interrupted until another vendor is awarded the contract. 

  This emergency purchase ended August 31, 2010.

   Signed By: William Strahle, SPO

      Vendor:  Canteen Correctional Serv.                                                     Notary Date:           10/4/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $110,835.72                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 14 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  29     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       10/7/2010

  This vendor provides assistive technology services to DRS staff and customers.  They ensure that DRS intranet,

   forms, documents, and all other types of communication are accessible.  Without this service in place,

  DHS/DRS will be out of compliance with Titles I and II of the Americans with Disabilities Act of 1990 for

  employment and public services.  Section 504 of the US Rehabilitation Act and Illinois Administrative Order

  #1.  DHS/DRS is in the process of posting an RFP for these services but need something in place until the RFP

  is completed.

   Signed By: William Strahle, SPO

      Vendor:  Marucco, Stoddard, Ferenbach                                                Notary Date:           9/30/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $65,625.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  30     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       10/7/2010

  A steam leak was detected at Jacksonville Developmental Center's power plant boiler room.  The leak is on the

   main header, the main pipe that supplies steam to all other lines on campus.  In order to isolate it we must shut

  down the power plant and it will take several days to fix.  If this leak is not repaired, we run the risk of having

  no heat, air conditioning or electricity for the whole campus, because we do not have any back up power and

  we don't want to run the risk of an explosion.

   Signed By: William Strahle, SPO

      Vendor:  Doyle Plumbing & Heating                                                      Notary Date:           9/30/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 15 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  31     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       11/5/2010

  To prevent or minimize serious disruption of the ability to get reimbursement for Medicare Part A, B, and D

  Claims that affect the collection of substantial State revenues.  The vendor processes all of these claims for

  IDHS and DHS does not have the capacity to file these claims on their own.  IDHS will lose an estimated

  $586,000 per month without this vendor processing claims.  This emergency is needed to continue services

  and to allow for the completion of the RFP solicitation process.

   Signed By: William Strahle, SPO

      Vendor:  Public Consulting Group Inc.                                                   Notary Date:           11/1/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $245,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  32     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:      11/12/2010

  CMS has mandated that CHP staff currently located at 1112 South Wabash in Chicago relocate to 401 South

  Clinton in Chicago on November 5, 2010.  This PBC is for the reconfiguration of existing furniture for the site at

   401 South Clinton.  Additionally, the Division of Community Health and Prevention will lose the warranty on

  the existing furniture if Illini Supply is not utilized as the Vendor.  Midwest Moving and Storage is not being used

   because they are not an authorized Haworth/Design Options Systems furniture installer.

   Signed By: William Strahle, SPO

      Vendor:  Illini Supply                                                                             Notary Date:           11/8/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $61,575.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 16 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  33     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:      10/28/2010

  The Department of Corrections is specifically required by the federal law to provide comprehensive medical and

  mental health services to IDOC inmates in order to maintain the health status through services that are similar to

  the comprehensive medical and mental health services available to members of the general public.  Extending the

current contract while completing the procurement process for the RFP will allow IDOC to continue to provide

continuity of care to the inmates housed in State correctional facilities.  HFS has issued a comprehensive

  medical and mental health services RFP to establish a new contract.  Proposals were received October 15,

  2010 but additional time is needed to complete the evaluation and implementation process.

   Signed By: Brett Cox, SPO

      Vendor:  Wexford Health Systems                                                        Notary Date:         10/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $26,769,450.0                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  34     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/22/2010

  The building located at 401 Washington Street, Algonquin, IL, known as "Toastmaster" was purchased by the

  State of Illinois to make way for the Algonquin Bypass. Said building suffered a major fire on the morning of

  October 18, 2010 causing severe structural damage to the building.  The City of Algonquin, the Illinois State

  Police and the Illinois State Fire Marshal all directed the Department of Transportation, as owners of the

  building to make immediate arrangements to demolish the portions of the building in danger of collapse, as well

  as assisting in the investigation of criminal activity.  Due to the presence of potentially hazardous materials;

  removal of the debris shall be expedited to minimize the potential impacts to air and water quality for the

  surrounding community.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Brandenburg Industrial Ser.                                                     Notary Date:         10/20/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 17 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  35     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       11/4/2010

  The building located at 401 Washington Street, Algonquin, IL known as "Toastmaster" was purchased by the

  State of Illinois to make way for the Algonquin Bypass.  Said building suffered a major fire on the morning of

  10-18-10, causing severe structural damage to the building.  The Building was demolished immediately in order

  to allow for the fire to be completely extinguished.  Subsequent to the demolition, the Department was

  petitioned by the local authorities to quickly expedite the removal of the asbestos contaminated debris from the

  site to ensure there would be no further contamination of the water table, and general air quality in the area of

  the building, which is immediately adjacent to a grade school.  Additionally, Village officials as well as the local

  grade school expressed serious concerns about the possibility of area children illegally entering the site and

  possibly being injured.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Huckstorf                                                                               Notary Date:           11/4/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $450,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  36     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       12/7/2010

  Cracked heat exchangers in 3 of the 4 heating units that service the Willow Creek I-39 NB and SB Rest Areas

  were discovered during a service call.  The 4th unit is suspect and is recommended that it be replaced as well. 

  All 4 units are 1994 models and were installed during the same period.  The cracked heat exchangers allows

  carbon monoxide to enter the heating system servicing the rest areas which will require the buildings to be

  closed.  It is very dangerous to the public's health and safety to allow carbon monoxide to circulate into rest

  area.

   Signed By: Aaron Weatherholt, Bureau Chief

      Vendor:  RBR Inc.                                                                               Notary Date:           12/6/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $13,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 18 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  37     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      12/28/2010

  Failure of port side shaft/propeller wheel on the Miss Illinois Push boat located at the Kampsville Ferry

  crossing.  Due to the nature of mechanical problems coupled with substantial river icing (suspected cause of the

  mechanical problems).  National Maintenance is the nearest facility with a dry dock and expertise to access the

  problems and repair the Miss Illinois.

   Signed By: Mary Lamie, Deputy Director

      Vendor:  National Maintenance & Repair                                              Notary Date:         12/23/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $35,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  38     TOLL HIGHWAY AUTHORITY, ILLINOIS STATE                     

                                                                                                                                   Filed:      10/12/2010

  Engineering requests to replace the existing surface discharge wastewater treatment facility at the Waukegan

  Plaza with an aerobic treatment unit.  These services are needed because the existing system requires an EPA

  permit which expires at the end of 2010.  This permit requires frequent sampling that the Tollway does not have

  the current capability to perform.  The replacement system will not require the permit will be less costly to

  maintain.  In addition, the current system cannot meet EPA permit requirements without modifications.  If the

  procurement is not approved and the permit requirements are not met, the Tollway will be subject to significant

  fines from the EPA of up to $25,000 per day.

   Signed By: Paul Kovacs, Chief Engineer

      Vendor:  Mellen Septic Services Inc.                                                     Notary Date:           10/4/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $43,400.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 19 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  39     CHICAGO STATE UNIVERSITY                                    

                                                                                                                                   Filed:      10/28/2010

  The university must renovate two biology laboratories, in time for its 2011 fall semester beginning in late August

  2010.  Recognizing its legal requirement for a competitive bid process should have been conducted, the time

  between the receipt of an approved design for laboratory casework and the time required for ordering the

  casework necessitated the University to declare an emergency as the lead time for such equipment can be 6-8

  weeks.  It was therefore necessary for the university to take immediate action in order to guarantee the products

   arrival and installation by August 15th.

   Signed By: Nathan Tindall, Director

      Vendor:  Laboratory Builders Inc.                                                         Notary Date:           7/12/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $173,000.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  40     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:       11/5/2010

  The IT division of CSU has encountered a critical need for power that puts the University at grave risk and is

  now a critical emergency.  The data center at CSU is so overburdened, that no more devices can be plugged in.

   Signed By: Glenn Meeks, VP of Admin.

      Vendor:  Foster Electric                                                                        Notary Date:         10/27/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $600,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 20 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  41     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       11/4/2010

  This emergency/quick purchase is required due to a situation in which immediate action was warranted to avoid

  the lapse or loss of federal or donated funds.  The purchase is for an environmental assessment of the coverage

  area for the Broadband Technology Opportunity Program grant.  The granting agency has placed a time limit to

  comply with special award conditions before releasing funding for project implementation.

   Signed By: Al Mueller, SPO

      Vendor:  Baxter & Woodman                                                               Notary Date:           11/3/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $500,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  42     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       11/8/2010

  Rapidly unfolding media interest and public inquiry into events surrounding disappearance and presumed death

  of a student required the assistance of the Abernathy MacGregor Group to assist with their specific expertise in

  crisis management and public relations.  This assistance was needed to prevent disruption in State services, to

  allow students to remain engaged in normal activities and to provide the public with needed information.

   Signed By: Al Mueller, SPO

      Vendor:  Abernathy MacGregor Group                                                  Notary Date:           11/3/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $35,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 21 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  43     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/27/2010

  The services of DoubleTree Hotel Riverside were engaged for lodging and meals for members of the University

  football team to the Humanitarian Bowl in Boise, Idaho on December 14, 2010 to December 17, 2010.  There

  was insufficient time to bid this purchase from the time the University was invited to participate in the bowl game.

   Signed By: Al Mueller, SPO

      Vendor:  DoubleTree Hotel Riverside                                                    Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $110,600.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  44     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/27/2010

  The services of Air Fax Inc. were engaged for charter service to transport members of the University football

  team to the Humanitarian Bowl in Boise, Idaho on December 14, 2010 to December 18, 2010.  There was

  insufficient time to bid this purchase from the time the University was invited to participate in the bowl game.

   Signed By: Al Mueller, SPO

      Vendor:  Air Fax Inc.                                                                           Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $113,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 22 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  45     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       11/8/2010

  This emergency expenditure is for the purchase of software, updates and support for the Information Trust

  Institute at the University of Illinois.  The Mu Studio software suite is core to the needs of a multitude of testbed

  testing associated with the Trustworthy Cyber Infrastructure for the Power Gripd testbed and other testbed

  facilities under the direction of the Information Trust Institute (ITI).  The ITI plans on leveraging its unique

  capabilities and industry acceptance to augment their research efforts and provide possible acceleration of

  technology transition to Industry.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Mu Dynamics                                                                         Notary Date:         10/29/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $63,992.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  46     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       12/1/2010

  The emergency service for the overhaul and replacement of a gas turbine-driven generator located at UIC West

   Campus Steam Plant.  The generator provides essential steam and electricity to the majority of the west

  campus medical center facility.

   Signed By: Maria de Lourdes Coss, SPO

      Vendor:  Solar Turbines                                                                        Notary Date:           12/1/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $711,501.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 23 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  47     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      12/14/2010

  The U of I Housing Department has experienced multiple public safety issues concerning student safety. 

  Incidents of sexual abuse in a fourth floor shower room of student housing, and at least two incidents of peeping

   toms entering shower facilities and taking photos while the showers were occupied have occurred. 

  Additionally, there has been an increase in physical attacks of lone males in the campus area.  These

  circumstances causing the housing department to reevaluate security measures on campus and within the student

   housing units.  The reevaluation resulted in the  need for housing to replace locks, hardware, shower stall doors

   and exit door alarms that were potential security issues.

   Signed By: Maxine Sundretto, SPO

      Vendor:  Security Door & Hardware                                                     Notary Date:         12/10/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $95,671.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  48     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      12/27/2010

  This emergency expenditure is for hotel accommodations and catering services for the University of Illinois Band

   and Cheerleaders when they participate in the Texas Bowl, Houston, Texas.  The Texas Bowl Committee

  negotiated hotel contract for the tournament and dictated where the participants would stay.  The University has

   no choice in the location.  Without this transaction the University of Illinois Band and Cheerleaders would not

  have a place to stay.  The costs are considered reasonable and acceptable.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Landry's Management LP                                                       Notary Date:         12/17/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 24 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  49     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      12/27/2010

  This emergency expenditure is for hotel accommodations and catering services for the University of Illinois

  Football Team when they participate in the Texas Bowl, Houston, Texas.  The Texas Bowl Committee

  negotiated the hotel contract for the tournament and dictate where the participants would stay.  The University

  has no choice in the location.  Without this transaction the University of Illinois Football Team would not have a

  place to stay and would not be able to participate in the Bowl event.  The costs are reasonable and acceptable.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Hyatt Corporation                                                                   Notary Date:         12/17/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $275,000.00                      $0.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  50     TREASURER - FISCAL OFFICER                                 

                                                                                                                                   Filed:       7/14/2009

  A letter was received dated October 25, 2010 reporting the actual cost of item #4 in our October 15, 2009

  report as $5,546.12.

   Signed By: Ed Buckles, Chief Procurement Officer

      Vendor:  National City Merchant                                                           Notary Date:           7/10/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $30,000.00                $5,546.12                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 25 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  51     TREASURER - FISCAL OFFICER                                 

                                                                                                                                   Filed:         8/3/2009

  A letter was received dated October 25, 2010 reporting the actual cost of item #5 in our October 15, 2009

  report as $141,055.47.

   Signed By: Ed Buckles, Chief Procurement Officer

      Vendor:  International Bank of Chicago                                                 Notary Date:           7/30/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $400,000.00             $141,055.47                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  52     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       6/30/2010

  A letter was received dated October 25, 2010 reporting the actual cost of item #3 in our July 15, 2010 report

  as $345,451.95.

   Signed By: Gwyn Gurgens, SPO

      Vendor:  Nationwide Janitorial Corp                                                      Notary Date:           6/29/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $345,451.95             $345,451.95                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  53     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/24/2010

  A letter was received dated October 26, 2010 reporting the actual cost of item #18 in our July 15, 2010 report

   as $69,184.00.

   Signed By: Marcus Hardy, Warden

      Vendor:  Unknown                                                                               Notary Date:           6/16/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $72,600.00              $69,184.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 26 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  54     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       5/10/2010

  A letter was received dated 10-28-10 reporting the actual cost of item #11 in our July 15, 2010 report as

  $143,722.70.

   Signed By: Donna Lindemulder, CEO

      Vendor:  Korrect Optical                                                                      Notary Date:           4/28/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $175,000.00             $143,722.70                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  55     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       6/16/2010

  A letter was received dated 10-28-10 reporting the actual cost of item #15 in our July 15, 2010 report as

  $94,226.30.

   Signed By: Carolyn Trancoso, Warden

      Vendor:  Unknown                                                                               Notary Date:             6/7/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $100,000.00              $94,226.30                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  56     EMPLOYMENT SECURITY, DEPARTMENT OF                         

                                                                                                                                   Filed:       5/10/2010

  A letter was received dated October 22, 2010 reporting the actual cost of item #20 in our July 15, 2010 report

   as $42,576.83.

   Signed By: Barry Isaacson, SPO

      Vendor:  Direct Response Resource                                                      Notary Date:             5/6/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $45,000.00              $42,576.83                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 27 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  57     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       4/21/2010

  A letter was received dated July 22, 2010 reporting the actual cost of item  #22 in our July 15, 2010 report as

  $18,721.79.

   Signed By: George Ryan, Regional Engineer

      Vendor:  Fischer Excavating                                                                 Notary Date:             4/9/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $27,000.00              $18,721.79                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  58     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       5/28/2010

  A letter was received dated July 26, 2010 reporting the actual cost of item #24 in our July 15, 2010 report as

  $101,233.35.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Land and Lakes                                                                      Notary Date:           5/20/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $110,000.00             $101,233.35                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  59     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:         8/3/2010

  A letter was received dated October 21, 2010 reporting the actual cost of item #44 in our  October 15, 2010

  report as $325,432.19.

   Signed By: George Ryan, Regional Engineer

      Vendor:  Civil Constructors Inc.                                                            Notary Date:           7/28/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $1,000,000.00             $325,432.19                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 28 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  60     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       9/15/2010

  A letter was received dated December 14, 2010 reporting the actual cost of item #46 in our October 15, 2010

  report as $31,034.45.

   Signed By: George Ryan, Regional Engineer

      Vendor:  Civil Constructors of Illinois                                                     Notary Date:             9/9/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00              $31,034.45                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  61     HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:      12/15/2008

  A letter was received dated December 8, 2010 reporting the actual cost of item #31 in our January 15, 2009

  report as $122,186.31.

   Signed By: Jan Grimes, Executive Director

      Vendor:  Unknown                                                                               Notary Date:         12/10/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $60,000.00             $122,186.31                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  62     HISTORIC PRESERVATION AGENCY                               

                                                                                                                                   Filed:      12/15/2008

  A letter was received dated December 8, 2010 reporting the actual cost of item #32 in our January 15, 2009

  report as $221,457.18.

   Signed By: Jan Grimes, Executive Director

      Vendor:  Unknown                                                                               Notary Date:         12/10/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $345,000.00             $221,457.18                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 29 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  63     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:       8/23/2010

  A letter was received dated October 5, 2010 reporting the actual cost of item #56 in our October 15, 2010

  report as $197,200.

   Signed By: Al Mueller, SPO

      Vendor:  Sterling Commercial Roofing                                                   Notary Date:           8/17/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $227,000.00             $197,200.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  64     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       10/6/2009

  A letter was received dated October 28, 2010 reporting the actual cost of item #42 in our January 15, 2010

  report as $271,136.71.

   Signed By: Mike Devocelle, SPO

      Vendor:  IBM                                                                                      Notary Date:           10/2/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $813,410.00             $271,136.71                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  65     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       7/25/2008

  A letter was received dated 11-9-10 reporting the actual cost of item #46 in our October 15, 2008 report as

  $594,340.58.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  MARSH USA Inc.                                                                 Notary Date:           7/21/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $600,000.00             $594,340.58                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 30 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  66     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:         7/3/2008

  A letter was received dated 11-9-10 reporting the actual cost of item #51 in our October 15, 2008 report as

  $125,206.11.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Kroeschell, Inc.                                                                      Notary Date:           5/29/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $245,321.00             $125,206.11                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  67     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       6/10/2008

  A letter was received dated 11-9-10 reporting the actual cost of item #65 in our July 15, 2008 report as

  $17,273.81.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  John A. Eby & Sons, Inc.                                                        Notary Date:             6/2/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $34,889.00              $17,273.81                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

  68     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       6/30/2008

  A letter was received dated 11-9-10 reporting the actual cost of item #69 in our July 15, 2008 report as

  $123,075.

   Signed By: Heather Haberaecker, Exec. Asst. VP

      Vendor:  Kroeschell, Inc.                                                                      Notary Date:           6/25/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $123,075.00             $123,075.00                                                 11               2

     Federal Cost                    $0.00                      $0.00

1/13/2011                                                          rptQuarterlyWeb                                                     Page 31 of  32


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                  October 1, 2010 through December 31, 2010

  69     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       6/30/2008

  A letter dated 11-9-10 was received reporting the actual cost of item #70 in our July 15, 2008 report as

  $133,779.81.

   Signed By: Heather Haberaecker, Asst. VP

      Vendor:  Anchor Mechanical Inc.                                                          Notary Date:           6/25/2008

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $133,779.81             $133,779.81                                                 11               2

     Federal Cost                    $0.00                      $0.00

 

 

 

 

1/13/2011                 rptQuarterlyWeb           Page 32 of  32