  To properly complete the compliance examination of the Prisoner Review Board for the two years ended June

  30, 2010, the engagement needs to begin as soon as possible.  Following internal discussions, it was determined

   we did not have sufficient internal staff resources to conduct this engagement.  Insufficient time exists to conduct

   the usual request for proposals competitive selection process prior to January 17, 2011.  A fair and reasonable

   price was negotiated with Kyle McGinnis CPA, who has experience with the Auditor General's program and

  has sufficient staff and expertise to perform this engagement and begin work within the necessary timeframe to

  avoid serious disruption in OAG audit services.

   Signed By: Bruce Bullard, Director

      Vendor:  Kyle McGinnis CPA                                                               Notary Date:           1/10/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $42,750.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  2       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:       1/15/2011

  The financial audit of the Regional Office of Education #19 needs to commence as soon as possible.  There was

   a need to procure the services of a new special assistant auditor to conduct this audit.  Given the late issuance

  of the FY 2009 audit report, and the need to begin the FY 2010 audit, there was insufficient time to

  competitively procure services.

   Signed By: James Schlouch, Director

      Vendor:  E.C. Ortiz & Co.                                                                    Notary Date:           1/15/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $28,520.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 1 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  3       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:       1/13/2011

  The financial audit of the Regional Office of Education #34 needs to commence as soon as possible. There was

  a need to procure the services of a new special assistant auditor to conduct this audit.  Given the late issuance of

   the FY 2009 audit report, and the need to begin the FY 2010 audit, there was insufficient time to competitively

   procure services.

   Signed By: James Schlouch, Director

      Vendor:  E.C. Ortiz & Co.                                                                    Notary Date:           1/13/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $32,488.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  4       AUDITOR GENERAL -  OFFICE OF THE                           

                                                                                                                                   Filed:         1/3/2011

  To properly complete the compliance examination of the Property Tax Appeal Board for the two years ended

  June 30, 2010, the engagement needs to begin as soon as possible.  Following internal discussions, it was

  determined we did not have sufficient internal staff resources to conduct this engagement.  Insufficient time exists

   to conduct the usual request for proposals competitive selection process prior to January 11, 2011.  A fair and

  reasonable price was negotiated with DeRaimo Motto & Associates, who has experience with the Auditor

  General's program and has sufficient staff and expertise to perform this engagement and begin work within the

  necessary timeframe to avoid serious disruption in OAG audit services.

   Signed By: Bruce Bullard, Director

      Vendor:  DeRaimo Motto & Associates                                                 Notary Date:             1/3/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $40,500.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 2 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  5       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       3/17/2011

  The Emergency Procurement of Centrex services from AT&T for the 3 month period of March 16, 2011 -

  June 15, 2011 is necessary due to the fact that the award notice for the solicitation for a new Statewide Telecom

   Network Voice & Data Services contract was posted to the Illinois Procurement Bulletin on 12-8-10.  Notice

  of this emergency purchase was published to Illinois Procurement Bulletin on 2-14-11 using estimated cost as

  shown.  Network services voice & data communications are essential to State government business.  This

  emergency purchase is intended to allow time for a Statewide Telecom Network Voice & Data Services

  contract to be negotiated and executed.

   Signed By: Phil Kaufmann, SPO

      Vendor:  AT&T Global Services                                                           Notary Date:           3/11/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $2,329,494.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  6       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       3/17/2011

  The Emergency Procurement of Centrex services from AT&T for the 3 month period of March 16, 2011 -

  June 15, 2011 is necessary due to the fact that the award notice for the solicitation for a new Statewide Telecom

   Network Voice & Data Services contract was posted to the Illinois Procurement Bulletin on 12-8-10.  Notice

  of this emergency purchase was published to Illinois Procurement Bulletin on 2-14-11 using estimated cost as

  shown.  Network services voice & data communications are essential to State government business.  This

  emergency purchase is intended to allow time for a Statewide Telecom Network Voice & Data Services

  contract to be negotiated and executed.

   Signed By: Phil Kaufmann, SPO

      Vendor:  AT&T Global Services                                                           Notary Date:           3/11/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $7,036,911.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 3 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  7       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       3/17/2011

  The Emergency Procurement of Centrex services from Sprint for the 3 month period of March 16, 2011 - June

  15, 2011 is necessary due to the fact that the award notice for the solicitation for a new Statewide Telecom

  Network Voice & Data Services contract was posted to the Illinois Procurement Bulletin on 12-8-10.  Notice

  of this emergency purchase was published to Illinois Procurement Bulletin on 2-14-11 using estimated cost as

  shown.  Network services voice & data communications are essential to State government business.  This

  emergency purchase is intended to allow time for a Statewide Telecom Network Voice & Data Services

  contract to be negotiated and executed.

   Signed By: Phil Kaufmann, SPO

      Vendor:  Sprint Communications Co.                                                     Notary Date:           3/11/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $891,354.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  8       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       3/18/2011

  The Department of Central Management Services has executed an emergency contract for mainframe

  application development.  As a result of various state and federal mandates the CMS Bureau of Benefits has

  submitted a number of projects to the CMS Bureau of Communications and Computer Services to modify the

  Benefits System.  Many of these projects have a time sensitive mandate; failing to complete these projects in a

  timely manner would result in approximately $15 million of additional costs to the State, including penalties to

  the federal government.

   Signed By: Phillip Kaufmann, SPO

      Vendor:  Capital Strategies Consulting                                                   Notary Date:           3/18/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $135,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 4 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  9       CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:       3/18/2011

  The service provided under this contract enables CMS, through the Illinois Century Network to provide

  connectivity between Bloomington/Normal and Champaign.  Any outage to the network adversely affects

  critical data communications for State agencies and impairs State government from conducting State business.

  Educational constituents that connect to the network are also at risk in the event of service disruption.

   Signed By: Phillip Kaufmann, SPO

      Vendor:  McLeod USA                                                                        Notary Date:           3/17/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $52,725.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  10     COMMERCE AND ECONOMIC OPPORTUNITY

                                                                                                                                   Filed:       3/25/2011

  This vendor was selected to ensure continuity, timely completion and cost effectiveness.  Capitol Strategies has

  worked on the EEP system, in a development role, and has the expertise and experience to make the necessary

   modifications.  All other vendors would require training in the application, EEP program, and business logic

  needed to reach informed decisions about new and changing system functionality;  this would add an additional

  month to the contract.

   Signed By: Warren Ribley, Director

      Vendor:  Capitol Strategies Inc.                                                             Notary Date:             3/1/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $164,400.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 5 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  11     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:       1/11/2011

  The Dept. of Natural Resources requires emergency services to abate hazardous conditions developing within a

   bridge on Interstate I-72 due to a sag-type subsidence.  The work will consist of drilling bore holes in mine

  depth, pumping of grout into mine voids and drilling investigation/verification boreholes to provide basic

  technical data and to verify grout distribution and strengths.  A sag subsidence approximately 150 diameters is

  causing two piers that support the East and West bound lanes of I-72 to settle about 4-6 inches.  If present

  boundary conditions remain static total settlement could approach 1.5 feet.  Collapse is deemed possible.  This

  procurement shall attempt to stop the subsidence by injecting cemented backfill into the mine in sufficient

  quantity to re-establish mine stability.

   Signed By: Norm Dixon, SPO

      Vendor:  Howard Concrete Pumping Co.                                               Notary Date:           1/10/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $448,960.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  12     DEPARTMENT OF JUVENILE JUSTICE

                                                                                                                                   Filed:       3/23/2011

  The boiler in the dorm/restroom/shower area of the youth living area is completely inoperable and needs to be

  replaced.  There is no heat in these areas at this time.  The vendor was selected due to competitive pricing in the

   past and a knowledge of the boiler situation at this facility from past experience.

   Signed By: Karen McKinney, Superintendent

      Vendor:  Kane Mechanical                                                                   Notary Date:           3/16/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 6 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  13     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       1/24/2011

  This is the second emergency filed for 3 compartment foam trays in FY 11.  The dishwasher in the Inmate

  Kitchen has been broken since December 31, 2010.  Due to the dishwasher being down there is no mechanism

   for properly washing and sanitizing the plastic trays and cups normally used for serving the offender meals,

  therefore, it is necessary for the facility to utilize foam trays to provide the offenders with the daily meals.

   Signed By: David Rednour, Warden

      Vendor:  Black Dog Chicago Corp.                                                       Notary Date:           1/13/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $38,934.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  14     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       1/25/2011

  The Dietary Building is without a dish/tray machine to properly sanitize utensils, cups, dishes and trays used by

  inmates and staff.  This is a health and safety issue.

   Signed By: Nedra Chandler, Warden

      Vendor:  CVK Enterprises Inc.                                                             Notary Date:           1/20/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $109,013.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 7 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  15     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       1/25/2011

  The purchase of various collagen casings and cookbags due to the expiration of the State contract.  These bags

  and casings are used in the production of various meat products.

   Signed By: Tim Gleason, CEO

      Vendor:  Various                                                                                  Notary Date:           1/24/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $59,574.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  16     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       1/12/2011

  Black Diamond Foods chose not to deliver NFDM as listed in the solicitation for bid and the contract.  NFDM

  powder must be labeled Grade A powder.  Have been told by CMS buyer, that the contract will have to be

  rebid.  ICI must have NFDM Grade A powder to reconstitute and process for the Dept. of Corrections as well

   as the Dept. of Human Services. Original contract still tied up in legal.  A public hearing was held on 12-30-10

  and an extension of 120 days was granted by CPO Matt Brown.

   Signed By: Tim Gleason, CEO

      Vendor:  Franklin Farms                                                                       Notary Date:             1/5/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $725,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 8 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  17     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       1/27/2011

  Our current cardboard vendor is refusing to deliver cardboard sheeting until they receive a price increase. 

  Without access to cardboard sheeting, our operation in our meat and eyeglasses production will be at a stand-

  still.  We also provide boxes to various State agencies.

   Signed By: Neil Rossi, Regional Manager

      Vendor:  International Paper                                                                 Notary Date:           1/25/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $103,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  18     CORRECTIONS - GENERAL OFFICE                                

                                                                                                                                   Filed:       1/26/2011

  The make-up air handling units in Building BC0138 supply the kitchen with heat during the winter months.  The

  hot water supply and return lines are badly deteriorated and beyond repair and could rupture causing the loss of

   hundreds of gallons of chemically treated boiler water and causing damage to the kitchen area and equipment.

   Signed By: Nedra Chandler, Warden

      Vendor:  Mechanical Incorporated                                                         Notary Date:           1/20/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $53,314.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                       Page 9 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  19     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       1/31/2011

  Vienna Corr. Center is in violation of EPA standards and regulations, these repairs are mandated for the Sewer

  Plant to come into compliance.  The secondary clarifier, the aerator and 5 submersible pumps need to be

  replaced.  Due to the secondary clarifier not functioning waste water can not be cycled through the process to

  achieve the levels of contaminants required by the EPA.  With the maintenance department replacing the

  equipment listed and making repairs to the wastewater system Vienna CC will once again be in compliance with

   all mandated specifications set for the by the EPA.

   Signed By: John Cox, Warden

      Vendor:  Various                                                                                  Notary Date:           1/28/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $38,688.91                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  20     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:         3/1/2011

  Illinois Correctional Industries provides Department of Corrections with inmate pants and coats which are cut at

   the garment shop located at Sheridan Correctional Center and sewn at Dwight Correctional Industries.  A

  contract is in place with Einstein to purchase the blue twill used for these items.  They wanted a price increase

  on the material due to high cotton prices and refused to deliver material.  An agreement has been reached, but it

   will take over 3 months to receive material.  American Textile can have this material delivered within a week,

  eliminating IDOC from running out of pants and coats.

   Signed By: James Clinton, PSA

      Vendor:  American Textiles Systems                                                     Notary Date:           2/18/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $53,750.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 10 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  21     MILITARY AFFAIRS, DEPARTMENT OF                            

                                                                                                                                   Filed:         1/4/2011

  The Department of Military Affairs has used the State Master Contract for the purchase of propane for the

  previous three years.  The previous contract has lapsed and is currently being re-bid.  The Center is heated

  solely by propane and is using it at a very quick rate during the winter months.  If the facility requires more than

  one fill prior to the new master contract being in place the IDMA will exceed the small purchase threshold and

  would have been required to formally solicit sealed bids.  The facility did not have the time required to conduct

  the sealed bid process therefore an emergency purchase was conducted to ensure that the entire training facility

  does not go without heat potentially causing structural damage to the plumbing.

   Signed By: Ronald Wilson, SPO

      Vendor:  Grainco FS Inc.                                                                      Notary Date:         12/29/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  22     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:       3/29/2011

  The current substance abuse treatment services at the Big Muddy River Correctional Center expired on 12-31-

  10.  All the required documents have been submitted to Central Office to post this contract out for bids.  OMB

  has not yet approved this contract for position; therefore, the Big Muddy River Correctional Center is

  requesting a 2nd 90-day extension to the existing contract.

   Signed By: Ty Bates, Warden

      Vendor:  Jefferson County Comp. Serv.                                                 Notary Date:           3/24/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $64,838.61                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 11 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  23     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       2/25/2011

  The Ludeman Center will require an emergency purchase and installation of a new 6-ton freezer and

  compressor to replace the existing unit at the main kitchen that was damaged beyond repair by a snow plow

  during snow removal.  Due to lack of freezer space, adequate food supply will not be available for meal

  preparation for the 445 individuals at the Center and Tinley Park Mental Health Center that the Nutrition

  Management Department serves.  This emergency purchase is necessary because the installation of the new

  compressor must be completed immediately, in order to have adequate space for expected food deliveries

  within the next few days.

   Signed By: Ronald Wilson, EEC SPO

      Vendor:  Toltec Mechanical Inc.                                                           Notary Date:             2/9/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $12,300.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  24     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       2/25/2011

  The transformer that provides electricity to Building 27 at Tinley Park Mental Health Center has failed due to

  the extreme weather conditions of February 1, 2011 and cannot be repaired.  There would be no means of

  supplying heat to the building, which could result in further damage due to frozen water pipes.  Estimated

  expenditures will include the rental of a temporary generator and fuel until a replacement unit is installed.  The

  purchase of the transformer will include the replacement unit and the installation.

  A letter was received dated 2-25-2011 amending the estimated cost from $100,000 to $75,000.

   Signed By: Ronald Wilson, EEC SPO

      Vendor:  Various                                                                                  Notary Date:             2/9/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $75,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 12 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  25     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       2/25/2011

  On 2-10-11 at 6 a.m. a pipe burst in the basement of the Medical Building.  Water flooded the basement with

  two and a half feet of water.  The water knocked out electricity in the building as well as the facility's phone

  system and computer network server.  Facility plumbing staff was called out and shut off the water and

  engineering staff obtained equipment to start pumping the water out of the basement.

   Signed By: Ronald Wilson, SPO

      Vendor:  Various                                                                                  Notary Date:           2/15/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $200,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  26     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:         3/2/2011

  A large, primary air handler in Hawthorne Hall, the facility administration building, failed on 1-28-11.  This fan

  was installed as original equipment in 1967.  It appeared initially that replacement of the motor would suffice to

  bring it back into service.  However, because of its age, a peripheral part failed to recover adequately from the

  fan's failure.  On 2-7-11, a "soft start" controller, a device designed to bring the fan up to full speed slowly so as

   to avoid damage to the fan from sudden  acceleration to operating speed, also failed to perform adequately. 

  What could have been a relatively minor expense is growing into a potentially large expense.  This air handler is

  an essential component of the building's heating and ventilation system.  It is a large fan whose function cannot

  be made up by other fans or systems, due to the initial design.  Without this air handler functioning properly, it

  will be impossible to balance temperature and fresh air sufficiently to function adequately as offices.  The facility

  has no electrical repair and maintenance contract in place due to bidding and contracting delays.  These

  necessary repairs, along with prior FY 11 electrical repairs, will generate electrical repair expenses for FY 11 in

   excess of $10,000.

   Signed By: Ronald Wilson, SPO

      Vendor:  Kelson Burnett Co.                                                                 Notary Date:           2/15/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $15,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 13 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  27     HUMAN SERVICES, DEPARTMENT OF                              

                                                                                                                                   Filed:       3/21/2011

  For the emergency repairs to 2 large, high-pressure boilers at Singer Mental Health Center.  These boilers are

  original equipment in this 43-year old facility.  Fiscal Year 2011 has seen leaks from internal tubes in the boilers

  at an unprecedented level.  Expenses of $9,990 have been incurred year to date.  Water leaks from tubes in

  boiler #1 were recently repaired.  As soon as that boiler was ready to be put back in service, water leaks

  started from boiler #2.  Both boilers must be in working condition at all times, since, at any time, a leak in the

  one boiler operating may necessitate bringing the other boiler into service.

   Signed By: Kenneth Crutcher, SPO

      Vendor:  Rockford Steam Boiler Works                                                 Notary Date:           3/21/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $10,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  28     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:         3/4/2011

  The Department of Corrections is specifically required by federal law to provide comprehensive medical and

  mental health services to IDOC inmates in order to maintain the health status through services that are similar to

  the comprehensive medical and mental health services available to members of the general public.  Extending the

   current contract while completing the procurement process for the RFP will allow IDOC to continue to provide

   continuity of care to the inmates housed in State correctional facilities.  HFS has issued a comprehensive

  medical and mental health services RFP to establish a  new contract.  Proposals were received October 15,

  2010 but additional time is needed to finalize and implement the new contract.

   Signed By: Brett Cox, EEC SPO

      Vendor:  Wexford Health Systems                                                        Notary Date:           2/25/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $26,769,450.0                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 14 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  29     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      12/29/2010

  McKesson is the sole source provider of five life-saving pharmaceuticals.  The State has been working to

  secure new bids for the products, but the contract expired on November 30, 2010 and a final contract is

  pending and under review by the Dept. of Central Management Services.  The Department must provide these

  pharmaceuticals pursuant to State law and additional time is necessary to get a new contract in place.  If the

  pharmaceuticals are not distributed, those needing the medications could experience serious health problems,

  including permanent brain damage or death.

  A letter was received dated 2-14-11 extending this contract and increasing the cost to $49,000.

  A letter was received dated 2-28-11 reporting the final cost as $23,397.30 and reporting that this vendor is no

  longer used.

   Signed By: Thomas Schafer, Dep. Director

      Vendor:  McKesson Medical Surgical                                                    Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $49,000.00              $23,397.30                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  30     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      12/29/2010

  VitaFlo USA is the sole source provider of 15 life-saving pharmaceuticals.  The State has been working to

  secure new bids for the products, but the contract expired on November 30, 2010 and a final contract is

  pending and under review by the Dept. of Central Management Services.  The Department must provide these

  pharmaceuticals pursuant to State law and additional time is necessary to get a new contract in place.  If the

  pharmaceuticals are not distributed, those needing the medications could experience serious health problems,

  including permanent brain damage or death.

  A letter was received dated February 14, 2011 extending this contract to 3-22-11 and increasing the amount to

   $67,000.

   Signed By: Thomas Schafer, Dep. Director

      Vendor:  VitaFlo USA                                                                          Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $67,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 15 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  31     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:      12/29/2010

  Nutricia North America is the sole source provider of 34 life-saving pharmaceuticals.  The State has been

  working to secure new bids for the products, but the contract expired on November 30, 2010 and a final

  contract is pending and under review by the Dept. of Central Management Services.  The Department must

  provide these pharmaceuticals pursuant to State law and additional time is necessary to get a new contract in

  place.  If the pharmaceuticals are not distributed, those needing the medications could experience serious health

  problems, including permanent brain damage or death.

  A letter was received dated 2-14-11 extending this contract to 3-22-11 and increasing the amount to

  $130,000.

  A letter was received dated 3-28-11 reporting the actual cost of this item to $134,000.

   Signed By: Thomas Schafer, Dep. Director

      Vendor:  Nutricia North America                                                          Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $130,000.00             $134,000.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  32     PUBLIC HEALTH, DEPARTMENT OF                               

                                                                                                                                   Filed:       2/28/2011

  To perform testing in compliance with the Illinois Administrative Code, Title 77: Public Health, Part 661

  Newborn Metabolic Screening and Treatment Code Sect. 661.10, which mandates sickle cell screening for all

   Illinois newborns, the Illinois Department of Public Health needs a contract to procure Sickle Cell Disease

  reagent test kits.

   Signed By: David Culp, Deputy Director

      Vendor:  Trininty Biotech Distribution                                                    Notary Date:           2/15/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $195,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 16 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  33     STATE POLICE, DEPARTMENT OF                                

                                                                                                                                   Filed:         3/4/2011

  On 2-22-11, the Illinois State Police Methamphetamine Program Office was informed all federal funding for

  clandestine methamphetamine laboratory cleanup costs would be terminated immediately due to ongoing

  unresolved budget negotiations in Washington, D.C.  With these finding cuts, the Illinois State Police has no

  mechanism in place to fund cleanup costs associated with clandestine laboratory seizures.  With no vendor in

  place, these temporary hazardous waste containers will fill up, placing the Illinois State Police in violation of

  federal EPA storage regulations.  This funding will allow the Illinois State Police to prevent an interruption of

  state services because a hazardous waste contractor could be selected and paid for from state funds.

   Signed By: Marty Lane, SPO

      Vendor:  SET Environmental Inc.                                                          Notary Date:             3/2/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $69,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  34     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       1/10/2011

  Interstate 72 bridges over the Sangamon River each have a substructure unit sinking due to mine subsidence. 

  Additional settlement of these substructure units will eventually cause these structures to no longer be able to

  safely carry vehicular traffic and will have to be closed.  IDOT staff currently are continuously on site monitoring

   these structures to determine if the structures should remain open to traffic.  A monitoring system capable of

  measuring the settlement and/or rotation of these substructure units on a 24/7 basis will be installed that will

  notify various individuals when a threshold or thresholds have been exceeded so the bridge or bridges can be

  closed prior to collapse.

   Signed By: William Frey, Dep. Director

      Vendor:  Bridge Diagnostics                                                                  Notary Date:             1/7/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $150,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 17 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  35     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       1/25/2011

  A leak was discovered in the radiant heating system on the second floor of the IDOT Hanley Building. 

  Subsequently, a second leak was discovered on the first floor.  The selected vendor proceeded to clean up and

  containerize the leaked solution, potassium dichromate, and clean up the affected areas.  The vendor will

  conduct post-incident air monitoring and wipe sampling to ensure the health and safety of employees that will

  return to work in the affected areas.  All containers will be relocated to a central location where they will be

  properly disposed of utilizing an existing waste disposal contract.

 

  A letter was received dated March 22, 2011 reporting the actual cost as $27,685.01.

   Signed By: James Reinhart, Acting Chief

      Vendor:  Bodine Environmental Services                                                Notary Date:           1/21/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $20,000.00              $27,685.01                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  36     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       3/22/2011

  Leaking heat combustion chambers allowing carbon monoxide to leak into the work areas of the buildings at

  Greenup, Charleston and Fairfield yards.  All locations have employees that are utilizing the work space,

  creating a hazardous situation.  Vendor has the experience, expertise and ability to perform the replacements in

  a timely manner.

   Signed By: Roger Driskell, Regional Engineer

      Vendor:  Jansen's Heating and Air Con.                                                 Notary Date:           3/17/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $37,105.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 18 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  37     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       3/17/2011

  IDOT has been working with the United States Geological Survey to acquire 2011 statewide aerial imagery. 

  The acquisition window is approximately March thru April.  The imagery is used throughout IDOT for planning

  initiatives and documentation and will become a part of our imagery archives.  IDOT obtained $1 million in

  federal funds from the Federal Highway Administration to apply towards this project.

   Signed By: William Frey, Deputy Director

      Vendor:  AeroMetric                                                                            Notary Date:           3/16/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                                                     $0.00                                                 11               3

     Federal Cost        $1,600,000.00                      $0.00

 

 

  38     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:       3/16/2011

  The Illinois Veterans Home at LaSalle is a 200 bed skilled care nursing facility serving the needs of aging Illinois

  war veterans.  The Home is required by law to provide all necessary care which includes medical treatment and

  pharmaceuticals and pharmacy services associated with such treatment.  The Home does not have an on-site

  pharmacy nor the space or staff to house one.  An emergency purchase is being utilized, to ensure the veterans

  residents receive their necessary medications, while an RFP is completed and a contract awarded.

   Signed By: Ronald Wilson,

      Vendor:  Enloe Drugs                                                                           Notary Date:           3/17/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $217,500.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 19 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  39     CAPITAL DEVELOPMENT BOARD                                  

                                                                                                                                   Filed:       1/27/2011

  On 1-13-11 due to an unknown occurrence, a sprinkler line broke causing water to leak from the attic down to

   the 2nd floor in the west wing of the Illinois Capitol Building.  This leak caused extensive damage throughout

  the west wing of the capitol building.

   Signed By: Gus Behnke, Exec. Director

      Vendor:  Unknown                                                                               Notary Date:           1/26/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $350,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  40     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       1/12/2011

  The U of I Housing Department has experienced multiple public safety issues concerning student safety. 

  Incidents of sexual abuse in a fourth floor shower room of student housing and at least two incidents of peeping

  Toms entering shower facilities and taking photos while the showers were occupied have occurred.  These

  circumstances caused the Housing department to reevaluate security measures within the shower facilities within

  the student housing units.  The reevaluation resulted in the need for housing to immediately replace 178 shower

  stall doors in the women's shower areas where the above mentioned incidents occurred.  The balance of the

  shower doors in all shower areas will be replaced in addition to these initial 178 doors.  The additional 720

  shower doors will be bid in accordance with University policy and the Illinois State Procurement Code. 

  Because these issues involved student and public safety, the department needed to respond quickly to ensure

  student safety.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Security Door & Hardware                                                     Notary Date:             1/7/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $46,280.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 20 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  41     CHICAGO STATE UNIVERSITY                                   

                                                                                                                                   Filed:       3/15/2011

  The IT Division of CSU has encountered a critical need for power that puts the University at grave risk, and is

  now a critical emergency.  The data center at CSU is so overburdened, that no more devices can be plugged in.

   Signed By: Glenn Meeks, VP of Admin.

      Vendor:  Foster Electric                                                                        Notary Date:           3/12/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00             $436,892.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  42     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       1/31/2011

  The University issued a RFP for Endoscopy equipment for cats and dogs.  The RFP opened on 1-13-11. 

  There was only one respondent and they did not provide a Board of Elections certificate, therefore, they were

  disqualified.  In addition, this equipment is not available through third party lease or rental.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Karl Storz Vet Endoscopy                                                       Notary Date:           1/21/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $76,075.34                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 21 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  43     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       2/22/2011

  This purchase is for a very rare and unique collection of papers, books and photographs on Carl Sandburg that

  belonged to the author's personal secretary, William Schenk.  This collection will enhance and compliment the

  existing Carl Sandburg collection in the Rare Book Room at the U of I Library.  This collection will not only

  solidify the Library's position as the primary holder of Sandburg manuscripts, but will offer unprecedented

  research potential to Sandburg scholars.  With the sale of this unique collection, the Schenk family transfers all

  rights of ownership to the U of I including all copyrights for the photographs taken by William Schenk.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Amy Schenk                                                                          Notary Date:           2/15/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $90,000.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  44     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       3/23/2011

  This emergency expenditure is for bus services for the U of I basketball team when they participate in the

  NCAA Basketball Tournament in Tulsa, OK.  The NCAA Tournament Committee negotiated the bus contacts

  for the tournament and told each team who they could contract with.  Without this transaction the U of I

  basketball team would have no transportation for team and their equipment.  The costs are considered

  reasonable and acceptable.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Kincaid Coach Lines Inc.                                                        Notary Date:           3/16/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $45,000.00                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 22 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  45     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       3/23/2011

  This emergency expenditure is for hotel accommodations and catering services for the U of I basketball team

  when they participate in the NCAA Basketball Tournament in Tulsa, OK.  The NCAA Tournament Committee

   negotiated the hotel accommodations contact for the tournament and dictated where the team would stay.  The

  University has no choice in the location.  Without this transaction the U of I basketball team would not have a

  place to stay.  The costs are considered reasonable and acceptable.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Iproc Tulsa LLC/Double Tree                                                 Notary Date:           3/16/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,537.25                      $0.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  46     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:       3/25/2011

  On 2-9-11, the Purchasing Division was informed that the heating system at the College of Medicine Research

  Building suffered a ruptured steam line that resulted in a flood in the basement.  After the initial work was

  completed, it was determined that electrical components had been damaged by the steam and water.  This

  prompted Facilities Management to obtain additional repairs for the newly discovered damages to the electrical

  equipment.  The building had to be shut down for three days.  The additional labor and material to complete the

  repairs required an additional $32,500.  Purchasing received the notice for the additional amount on 3-21-11.

   Signed By: Eugene Suwanski, Director

      Vendor:  Anchor Mechanical, Inc.                                                         Notary Date:           3/25/2011

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:                       $0.00              $82,500.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 23 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  47     TREASURER - FISCAL OFFICER                                 

                                                                                                                                   Filed:       8/30/2010

  A letter was received dated January 25, 2011 reporting the actual cost of item #2 in our October 15, 2010

  report as $34,466.27.

   Signed By: Edward Buckles, Chief Procurement Officer

      Vendor:  MB Financial                                                                          Notary Date:           8/26/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $45,000.00              $34,466.27                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  48     TREASURER - FISCAL OFFICER                                 

                                                                                                                                   Filed:       8/30/2010

  A letter was received dated January 25, 2011 reporting the actual cost of item #3 in our October 15, 2010

  report as $546,107.77.

   Signed By: Edward Buckles, Chief Procurement Officer

      Vendor:  Illinois National Bank                                                              Notary Date:           8/26/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $772,000.00             $546,107.77                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  49     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/17/2009

  A letter was received dated February 3, 2011 reporting the actual cot of item #6 in our January 15, 2010

  report as $3,557,229.49.

   Signed By: Gwyn Gurgens, State Purchasing Officer

      Vendor:  Sprint                                                                                     Notary Date:         12/16/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $3,732,000.00          $3,557,229.49                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 24 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  50     CENTRAL MANAGEMENT SERVICES                                

                                                                                                                                   Filed:      12/17/2009

  A letter was received dated February 3, 2011 reporting the actual cost of item #5 in our January 15, 2010

  report as $27,537,559.05.

   Signed By: Gwyn Gurgens, State Purchasing Officer

      Vendor:  AT&T Global Services                                                           Notary Date:         12/16/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:           $27,600,000.0          $27,537,559.0                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  51     CHILDREN AND FAMILY SERVICES, DEPARTMENT OF         

                                                                                                                                   Filed:       9/16/2010

  A letter was received dated January 25, 2011 reporting the actual cost of item #4 in our October 15, 2010

  report as $35,990.10.

   Signed By: Sharon Clanton, SPO

      Vendor:  Amicus Court Reporters                                                         Notary Date:           2/18/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $50,000.00              $35,990.10                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  52     CHILDREN AND FAMILY SERVICES, DEPARTMENT OF         

                                                                                                                                   Filed:       9/16/2010

  A letter was received dated January 25, 2011 reporting the actual cost of item #5 in our October 15, 2010

  report as $73,905.00.

   Signed By: Sharon Clanton, SPO

      Vendor:  Ace Worldwide Movers                                                          Notary Date:           6/10/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $75,000.00              $73,905.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 25 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  53     CHILDREN AND FAMILY SERVICES, DEPARTMENT OF         

                                                                                                                                   Filed:       9/16/2010

  A letter was received dated January 25, 2011 reporting the actual cost of item #6 in our October 15, 2010

  report as $450,895.66.

   Signed By: Sharon Clanton, SPO

      Vendor:  Northwestern University                                                         Notary Date:             7/9/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $522,514.00             $450,895.66                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  54     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:       7/16/2010

  A letter was received dated December 28, 2010 reporting the actual cost of item #8 in our October 15, 2010

  report as $655,000.00.

   Signed By: Norm Dixon, State Purchasing Officer

      Vendor:  Various                                                                                  Notary Date:           7/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $655,000.00             $655,000.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  55     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:      10/14/2010

  A letter was received dated January 31, 2011 reporting the actual cost of item #8 in our January 14, 2011

  report as $108,624.00.

   Signed By: Norm Dixon, SPO

      Vendor:  Crowe Horwath LLP                                                              Notary Date:         10/13/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $95,000.00             $108,624.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 26 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  56     NATURAL RESOURCES, DEPARTMENT OF                           

                                                                                                                                   Filed:       8/10/2010

  A letter was received dated January 4, 2011 reporting the actual cost of item #9 in our October 15, 2010

  report as $68,770.00.

   Signed By: Norm Dixon, SPO

      Vendor:  Crowe Horwath LLP                                                              Notary Date:             8/6/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $85,000.00              $68,770.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  57     CORRECTIONS - GENERAL OFFICE                               

                                                                                                                                   Filed:      12/14/2010

  A letter was received dated January 20, 2011 reporting that item #2 in our January 14, 2011 report was

  revised to an actual amount of $62,066.37.

   Signed By: John Cox, Warden

      Vendor:  Kohl's                                                                                    Notary Date:         12/14/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $34,293.84              $62,066.37                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  58     HEALTHCARE AND FAMILY SERVICES, DEPT OF

                                                                                                                                   Filed:         7/6/2009

  A letter was received reporting the actual cost of item #19 in our October 15, 2009 report as $483,291.00.

   Signed By: Thomas Sestak, SPO

      Vendor:  Westside Youth Network Inc.                                                 Notary Date:           6/29/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $483,291.00             $483,291.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 27 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  59     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       12/7/2010

  A letter was received dated January 26, 2011 reporting the actual cost of item #36 in our January 14, 2011

  report as $12,953.51.

   Signed By: Aaron Weatherholt, Bureau Chief

      Vendor:  RBR Inc.                                                                               Notary Date:           12/6/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $13,000.00              $12,953.51                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  60     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      12/28/2010

  A letter was received dated January 21, 2011 reporting the actual cost of item #34 in our January 14, 2011

  report as $27,321.79.

   Signed By: Mary Lamie, Deputy Director

      Vendor:  National Maintenance & Repair                                              Notary Date:         12/23/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $35,000.00              $27,321.79                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  61     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:       11/4/2010

  A letter was received dated 2-14-11 reporting the actual cost of item #35 in our January 14, 2011 report as

  $424,775.43.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Huckstorf                                                                               Notary Date:           11/4/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $450,000.00             $424,775.43                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 28 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  62     TRANSPORTATION, DEPARTMENT OF                              

                                                                                                                                   Filed:      10/22/2010

  A letter was received dated 2-14-11 reporting the actual cost of item #34 in our January 14, 2011 report as

  $77,193.14.

   Signed By: Diane O'Keefe, Deputy Director

      Vendor:  Brandenburg Industrial Ser.                                                     Notary Date:         10/20/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,000.00              $77,193.14                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  63     VETERANS' AFFAIRS - GENERAL OFFICE                         

                                                                                                                                   Filed:         5/5/2009

  A letter was received dated January 21, 2011 reporting the actual cost of item #24 in our July 15, 2009 report

  as $65,559.00.

   Signed By: Deborah Miller, Chief Fiscal Officer

      Vendor:  Unknown                                                                               Notary Date:             5/4/2009

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $100,000.00              $65,559.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  64     VETERANS' AFFAIRS, ILLINOIS VETERANS' HOME -

                                                                                                                                   Filed:         4/1/2010

  A letter was received dated January 21, 2011 reporting the actual cost of item #15 in our April 15, 2010 report

   as $33,370.00.

   Signed By: Daniel Grant, Director

      Vendor:  Capital Development Board                                                     Notary Date:           3/30/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $40,000.00              $33,370.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 29 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  65     EMERGENCY MANAGEMENT AGENCY

                                                                                                                                   Filed:         7/7/2010

  A letter was received dated January 25, 2011 reporting the actual cost of item #49 in our October 15, 2010

  report as $167,046.72.

   Signed By: Todd Miller, SPO/CFO

      Vendor:  Hanson                                                                                  Notary Date:             7/7/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $450,000.00             $167,046.72                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  66     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/27/2010

  A letter was received dated 2-9-11 reporting the actual cost of item #44 in our January 14, 2011 report as

  $131,920.40.

   Signed By: Al Mueller, SPO

      Vendor:  Air Fax Inc.                                                                           Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $113,000.00             $131,920.40                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  67     NORTHERN ILLINOIS UNIVERSITY                               

                                                                                                                                   Filed:      12/27/2010

  A letter was received dated 2-8-11 reporting the actual cost of item #43 in our January 14, 2011 report as

  $64,680.00.

   Signed By: Al Mueller, SPO

      Vendor:  DoubleTree Hotel Riverside                                                    Notary Date:         12/22/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $110,600.00              $64,680.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 30 of  31


                                          LIST OF EMERGENCY PURCHASE AFFIDAVITS

                                    FILED WITH THE OFFICE OF THE AUDITOR GENERAL

                                                     January 1, 2011 through March 31, 2011

  68     UNIVERSITY OF ILLINOIS                                      

                                                                                                                                   Filed:       7/30/2010

  A letter was received dated January 21, 2011 reporting the actual cost of item #58 in our October 15, 2010

  report as $25,000.00.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Washington Speakers Bureau                                                  Notary Date:           7/28/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $25,000.00              $25,000.00                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  69     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      12/27/2010

  A letter was received dated 2-17-11 reporting the actual cost of item #49 in our January 14, 2011 report as

  $214,491.40.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Hyatt Corporation                                                                   Notary Date:         12/17/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:             $275,000.00             $214,491.40                                                 11               3

     Federal Cost                    $0.00                      $0.00

 

 

  70     UNIVERSITY OF ILLINOIS                                     

                                                                                                                                   Filed:      12/27/2010

  A letter was received dated 2-17-11 reporting the actual cost of item #48 in our January 14, 2011 report as

  $52,355.34.

   Signed By: Maxine Sandretto, SPO

      Vendor:  Landry's Management LP                                                       Notary Date:         12/17/2010

                                      Estimate                  Actual                                                  FY            QTR

     State Cost:               $80,000.00              $52,355.34                                                 11               3

     Federal Cost                    $0.00                      $0.00

4/12/2011                                                          rptQuarterlyWeb                                                     Page 31 of  31